My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2009-09-14
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2009
>
AgdaPkt 2009-09-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2009 11:44:09 AM
Creation date
9/10/2009 2:14:53 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Redevelopment Agency
Date
9/14/2009
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Redwood City Saltworks Scope of Services <br />September 10, 2009 <br /> <br />that pertains to the particular work session topic. Consultant and relevant <br />Review Team members will attend each of the work sessions as <br />applicable. <br />. Total Cost: $13,000 <br /> <br />Task 4: Saltworks Site, Bayfront Reconnaissance and General Plan <br />Update Review Session. In order to assess the Application its relevance <br />to the future vision and realities of the physical makeup of the City, <br />Consultant and members of the Review Team will require a tour of the <br />Redwood Saltworks site by OMB, as well as a tour of Redwood City's <br />Bayfront by the City. In addition, the City will present the New General <br />Plan in a review session with Consultant and applicable Review Team <br />members. <br />. Total Cost: $7,000 <br /> <br />Task 5: Coordination and Review of Summary Reports. Subsequent to <br />the completion of Tier One work sessions and any follow-up required, <br />Consultant will coordinate the compilation of Review Team findings and <br />conclusions into a draft summary report for each Tier One issue. These <br />draft reports will be completed in a three-step review and comment <br />process leading to the completion of a final draft summary report for each <br />issue. These deliverables will be submitted to the City for consideration <br />and possible use in subsequent City review processes. <br /> <br />. Total Cost: $18,000 <br /> <br />Task 6: Internal Review Management Team. As noted, the initial <br />Application review process will be overseen by an internal coordinating <br />and oversight group whose members will meet at regular intervals to <br />assess the progress of the work and guide the process. Consultant will be <br />in integral part of this group and will participate in a minimum of ten <br />meetings and/or conference calls over the course of the initial review of <br />the Tier One issues. <br />. Total Cost: $20,000 <br /> <br />4. Sub Consultants: <br />Consultant will contract with specialized sub consultants whose expertise <br />is required to complement that of the Consultant and the City staff for the <br />effective initial review of the three critical Tier One issues. The three <br />critical issue areas are (a) Water, (b) Transportation, and (c) Jurisdictional <br />Overlays. The sub consultants who shall be retained initially by the <br />Consultant and their respective Scopes of Work are as follows: <br /> <br />A. Water Group <br /> <br />Page 3 <br /> <br />6.1H <br />Page 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.