Laserfiche WebLink
6.11). - Page 20 of 21 <br />• Responses to RFls <br />• PDF copies of shop drawings/submittals during construction <br />• Conform set drawing in PDF format <br />• Record drawing in PDF and AutoCAD formats <br />Task 8 — Design Services During Installation (Consultant needs City <br />authorization to proceed with this task) <br />Consultant shall provide technical support and attend field visit during installation, as <br />needed, for up to 20 hours of total staff time. Consultant shall also assist the City in <br />community meetings, documenting and evaluating any community feedback after the <br />project installation. <br />Task 8 Deliverable: <br />• PowerPoint presentation for potential community meetings for up to two (2) <br />meetings <br />Task 9 — Post -Construction Evaluation (Consultant needs City <br />authorization to proceed with this task) <br />Consultant shall complete the post -construction evaluation utilizing before and after data <br />collected in Task 2.2. Consultant shall summarize the results in a draft evaluation <br />technical memorandum. The draft memorandum will include table, charts, and figures <br />comparing the data before and after the project implementation. The draft memorandum <br />shall be submitted to the City for review. Based on one set of non -conflicting comments <br />from the City, Consultant shall revise the draft memorandum and submit a final technical <br />memorandum. <br />Task 9 Deliverables: <br />• Draft Pilot Evaluation technical memorandum <br />• Final Pilot Evaluation technical memorandum <br />Section 2: Fees <br />Consultant shall provide all services on a time and materials not to exceed fee basis. <br />Consultant shall charge the standard hourly rates for services listed in the rate schedule <br />below. The Fee Schedule below is a not -to -exceed estimate per task. Total compensation <br />REV: 04-08-2021 RL <br />ATTY/AGR.2021 075/Kimley-Horn (Roosevelt Quick -build Traffic Calming Project PS&E) (Page 16 of 17) 137 <br />