My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2021.04.26 Joint SA FPA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2021
>
AgdaPkt 2021.04.26 Joint SA FPA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2021 9:23:20 AM
Creation date
4/22/2021 4:50:14 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
4/26/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
571
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4 <br />- <br />N ." I I, �'� I IT <br />Item Description <br />Quote NumbAaaGflmP11?A <br />Altec, Inc. <br />handles are green in color to differentiate it from other non -tested controllers. <br />N. Platform capacity: 400 lbs. (181 kilograms) standard. <br />O. Small Boom Tip Profile. <br />P. Hydraulic system: Open center (full pressure), maximum flow of 6.0 to 6.5 gpm <br />(22.7 to 24.6 Ipm), maximum operating pressure of 3,000 psi. <br />Q. Diagnostic pressure test port is located at the lower control station to allow a <br />technician to quickly and easily attach a test gauge to verify system and tool <br />circuit pressure. <br />R. Unit is painted with a powder coat paint process which provides a finish -painted <br />surface that is highly resistant to chipping, scratching, abrasion and corrosion. <br />Paint is electrostatically applied to the inside as well as outside of fabricated parts <br />then high temperature cured prior to assembly ensuring maximum coverage and <br />protection. <br />S. Unit meets or exceeds ANSI 92.2 standards. <br />Manual Upper Boom Stow Securing System with support cradle and tie down strap. <br />Pedestal <br />4. Single 1 -Man Platform, 24 x 24 x 39, Side Mount, 90 Degree Rotation, Hydraulic <br />Platform Tilt, Shaft -Mounted Controls <br />5. One (1) Platform Step - located on the side of the platform nearest the elbow in the <br />stowed position <br />6. Platform Cover - Soft vinyl 24 x 24 inch (610 x 610 mm) <br />7. Platform Liner, 24 x 24 x 39 inches (610 x 610 x 991 mm), 50 kV Rating <br />8. Hydraulic Tool Circuit at Platform: Two (2) sets of tool couplers for open center tools, <br />one (1) set located on each side of the platform. <br />9. Hydraulic Tool Circuit Below Rotation: One set of quick disconnect couplings and <br />control valve for open center tools below rotation. <br />10. Engine Start/Stop & Secondary Stowage System: 12 VDC powered motor and pump <br />assembly for temporary operation of the unit in a situation wherein the primary hydraulic <br />source fails. Electric motor is powered by the chassis battery. This feature allows the <br />operator to completely stow the booms, platform, and outriggers. Secondary Stowage & <br />Start/Stop is activated with an air plunger at the platform or momentary switch at the <br />lower control station and outriggers. <br />11. Slip Ring: Required for engine start/stop, secondary stowage system, and throttle control <br />options <br />12. Primary A -Frame Outriggers with 5 -degree swivel shoe. For installation on a 36 to 40 <br />inch chassis frame height. <br />A. Maximum Spread: 140 inches to the outer edge of shoes <br />B. Ground Penetration: 7 to 11 inches depending on chassis frame height <br />C. Outrigger/Unit Selector Valve: reduces the potential for inadvertent outrigger <br />movement during machine operation if outrigger controls are bumped <br />D. Outrigger Control Valves: located on the outrigger legs <br />E. Outrigger Interlocks: will not allow the unit to be operated until the outriggers <br />have been at least partially deployed <br />F. Outrigger Motion Alarms <br />We Wish To Thank You For Giving Us The Pleasure <br />And Opportunity of Serving You <br />UTILITY EQUIPMENT AND BODIES SINCE 1929 <br />-Q-ty Price <br />Page 2 of 14 <br />201 <br />
The URL can be used to link to this page
Your browser does not support the video tag.