My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2021.04.26 Joint SA FPA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2021
>
AgdaPkt 2021.04.26 Joint SA FPA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2021 9:23:20 AM
Creation date
4/22/2021 4:50:14 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
4/26/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
571
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1. - Page 58 of 145 <br />Prepared for: <br />MIKE BLACKMON <br />ALTEC INDUSTRIES BB <br />1550 AERIAL AVE <br />CREEDMOOR, NC 27522 <br />Phone: 919-528-8058 <br />Data Code Description <br />QUOTE ID <br />REDW26K21-23M PW LR8-60RM <br />Attachment A <br />Prepared by: <br />Shane Hall <br />Peach State Freightliner <br />1755 Dry Pond Road <br />Jefferson, GA 30549 <br />Phone:7063678998 <br />Weight Weight <br />Front Rear <br />996-001 <br />U.S. FMVSS CERTIFICATION, EXCEPT SALES <br />CABS AND GLIDER KITS <br />Rr <br />AE8-99D <br />CALCULATED EFFECTIVE BACK OF CAB TO <br />REAR SUSPENSION C/L (CA) : 88.93 in <br />AM6-99D <br />CALC'D SPACE AVAILABLE FOR DECKPLATE : <br />85.45 in <br />NO SALES PROGRAMS HAVE BEEN SELECTED <br />TOTAL V1=H1CLE SUM MARY <br />Weight Weight Total <br />Front Rear Weight <br />Factory Weight+ 6094 lbs 3859 lbs 9953 lbs <br />Total Weight+ 6094 lbs 3859 lbs 9953 lbs <br />(+) Weights shown are estimates only. <br />If weight is critical, contact Customer Application Engineering. <br />(***) All cost increases for major components (Engines, Transmissions, Axles, Front and Rear Tires) and government mandated <br />requirements, tariffs, and raw material surcharges will be passed through and added to factory invoices. <br />Data Version PRL -23M.006 <br />REDW26K21-23M PW LR8-60RM <br />03/03/2021 10:53 AM <br />Page 16 of 21 <br />229 <br />
The URL can be used to link to this page
Your browser does not support the video tag.