My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2021.04.26 Joint SA FPA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2021
>
AgdaPkt 2021.04.26 Joint SA FPA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2021 9:23:20 AM
Creation date
4/22/2021 4:50:14 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
4/26/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
571
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1. - Page 102 of 145 <br />Attachment B <br />• hardware: Battery System: Batteries Approximate values: Nominal voltage: 355 V, Capacity: <br />17.7 kWh, Electric traction motor 355 V, 200 Nm continuous, 300 Nm Peak, Traction inverter, <br />on -board charger, DC/DC 4000 w, 285 A max, HCU, PDM, HVJB, Thermal management <br />components, display, inertia sensor, couplers, shafts, brackets, and other components <br />• Harnesses: HV and LV connection system: cabling, connectors <br />• Documentation: Operators manual, Maintenance information <br />• Other: retention of Allison Transmission warranty, the system must be installed per Odyne <br />guidelines and Odyne approved quality control documentation must be completed. <br />• Warranty: One Year Parts and Labor Limited Warranty (on failures due to system h/w or <br />controls, excludes installation workmanship) <br />Installation to include: <br />• Install Versalift unit and mounting hardware <br />• Install line body and accessories <br />• Paint body to match cab with non-skid on floor and compartment tops <br />■ PTO and pump <br />■ ICC bumper with 15 ton pintle hook tow package, D -rings and 7 -pole style trailer connector <br />• Mud flaps <br />• Back-up alarm <br />• Two (2) LED amber strobes installed at front of cab guard <br />• Two (2) LED amber strobes installed at rear of cab guard <br />• LED amber beacon install on boom rest mount street side <br />• LED amber beacon install on boom rest mount curb side <br />• LED spot light installed on boom rest mount street side <br />• LED spot light installed on boom rest mount curb side <br />• LED amber traffic advisor installed at rear with controller in cab <br />• 5 -Ib heavy duty fire extinguisher and mounting bracket <br />• Triangle kit and mounting bracket <br />• Manual pouch <br />• Two (2) Rubber wheel chocks with metal handle <br />• Four (4) polymer outrigger pads <br />• Test ride completed unit for one (1) hour <br />• Test and certify per ANSI A92.2 <br />Thank you for the opportunity to quote. Please call with any questions. <br />Regards, <br />Chip Reed <br />Regional Manager <br />Utility Crane & Equipment <br />(916) 413-1911 <br />273 <br />
The URL can be used to link to this page
Your browser does not support the video tag.