My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
RecDoc 2021-081502 STMMA_1266 Connecticut Drive
RedwoodCity
>
City Clerk
>
Recorded Docs CC&Rs
>
Recorded Docs 2013-2020 Additional sub folders
>
Recorded Documents 2013-2023 (additional sub folders)
>
Agreements
>
2019-2022
>
RecDoc 2021-081502 STMMA_1266 Connecticut Drive
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2022 4:06:19 PM
Creation date
6/30/2021 4:26:31 PM
Metadata
Fields
Template:
Recorded Docs
Recorded Docs - Type
Agreement
Subject
Stormwater Treatment Measures Maintenance
Doc Num
2021-081502
Rec Date
5/25/2021
Address
1266 Connecticut Drive
Reso Ref
15905
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT C <br />Infiltration Trench Maintenance Plan for <br />1266 Connecticut Drive <br />December 10, 2020 <br />An infiltration trench is a long, narrow, excavated <br />trench backfilled with a stone aggregate, and lined with <br />a filter fabric. Runoff is stored in the void space <br />between the stones and infiltrates through the bottom <br />and into the soil matrix. <br />Project Address and Cross Streets <br />1266 Connecticut Drive <br />Assessors Parcel No. 058-443-110 <br />Property Owner: Thomas James Homes <br />Phone No.: (650) 434-7966 <br />Designated Contact: Ken King <br />Phone No.: (650) 434-7966 <br />Mailing Address: 25S Shoreline Drive, Suite 428 <br />Redwood City, CA 94065 <br />The property contains 1 infiltration trench(es), located as described below and as shown in the <br />attached site plan. <br />Infiltration Trench No. 1 is located at the southwestern portion of the property (rear right). <br />Routine Maintenance Activities <br />The principal maintenance objective is to prevent sediment buildup and clogging, which reduces pollutant <br />removal efficiency and may lead to trench failure. Routine maintenance activities, and the frequency at which <br />they will be conducted, are shown in Table 1. <br />Table 1 <br />Routine Maintenance Activities for Infiltration Trenches <br />No. <br />Maintenance Task <br />Frequency of Task <br />1 <br />Remove obstructions, debris and trash from Infiltration trench <br />Monthly, or as needed after storm events <br />and dispose of properly. <br />2 <br />Inspect trench to ensure that it drains between storms, and <br />Monthly during wet season, or as needed after storm <br />within 5 days after rainfall. Check observation well 2-3 days <br />events <br />after storm to confirm drainage. <br />3 <br />Inspect filter fabric for sediment deposits by removing a small <br />Annually <br />section of the top layer. <br />4 <br />Monitor observation well to confirm that trench has drained <br />Annually, during dry season <br />during dry season. <br />s <br />Mow and trim vegetation around the trench to maintain a neat <br />As needed <br />and orderly appearance. <br />6 <br />Remove any trash, grass clippings and other debris along the <br />As needed <br />trench perimeter and dispose of properly. <br />7 <br />Check for erosion at inflow or overflow structures. <br />As needed <br />8 <br />Confirm that cap of observation well is sealed. <br />At every inspection <br />Page 1 <br />ATN/AGR.2021.083/SF20A, LLC (1266 Connecticut Drive) (Page 11 of 13) <br />Updated 1/1/20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.