My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
RecDoc 2021-066492 STMMA One20 Towns at 120 El Camino Real
RedwoodCity
>
City Clerk
>
Recorded Docs CC&Rs
>
Recorded Docs 2013-2020 Additional sub folders
>
Recorded Documents 2013-2023 (additional sub folders)
>
Agreements
>
2019-2022
>
RecDoc 2021-066492 STMMA One20 Towns at 120 El Camino Real
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2022 12:57:36 PM
Creation date
7/7/2021 9:19:06 AM
Metadata
Fields
Template:
Recorded Docs
Recorded Docs - Type
Agreement
Subject
Stormwater Treatment Measures Agreement
Doc Num
2021-066492
Rec Date
4/27/2021
Address
120 El Camino Real
MO Ref
21-053
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit "C <br />Storm Water Treatment Operation and Maintenance <br />Inspection Report to the City of Redwood City, California <br />This report and attached Inspection and Maintenance Checklists document the inspection <br />and maintenance conducted for the identified storm water treatment measure(s) subject to <br />the Maintenance Agreement between the City and the property owner during the annual <br />reporting period indicated below. <br />I. Property Information: <br />Property Address or APN: 052-064-160 <br />Property Owner: One2.Oth LLC <br />II. Contact Information: <br />Name of person to contact regarding this report: Jeff Curran <br />Contact Number: (408) 252-9131 Email: ie1Yc@12innbros.com <br />Address to which correspondence regarding this report should be directed: <br />1475 Saratoga Ave, Suite 250 <br />San Jose. CA 9412 <br />III. Reporting Period: <br />This report, with the attached completed inspection checklists, documents the inspections <br />and maintenance of the identified treatment measures during the time period from: <br />to <br />IV. Storm Water Treatment Measure Information: <br />The following storm water treatment measures (identified treatment measures) are <br />located on the property identified above and are subject to the Maintenance Agreement: <br />Treatment Device <br />Type of Treatment <br />Location <br />Bioretention Basin 1 <br />Bioretention <br />South side of site, adjacent to <br />(B.B.1) <br />property line <br />Bioretention Basin 2 <br />Bioretention <br />South side of site, adjacent to <br />(B.B.2) <br />property line, west of basin 1 <br />Flow -Through Planter 1 <br />Bioretention <br />North corner of site, adjacent to <br />(B.B.3) <br />El Camino Real and Finger Ave <br />Flow -Through Planter 2 <br />Bioretention <br />North side of site, adjacent to El <br />(B.B.4) <br />Camino Real <br />ATTY/AGR.2020.299/Pinn Bros (Page 15 of 21) <br />
The URL can be used to link to this page
Your browser does not support the video tag.