Laserfiche WebLink
Pipeline Crossing 06/05/18 <br />Foran Approved, AVP Law <br />EXHIBIT B <br />GENERAL TERMS AND CONDITIONS <br />Section 1. LIMITATION AND SUBORDINATION OF RIGHTS GRANTED. <br />A. The foregoing grant is subject and subordinate to the prior and continuing right and <br />obligation of Licensor to use and maintain its entire property including the right and power of Licensor to <br />construct, maintain, repair, renew, use, operate, change, modify or relocate railroad tracks, signal, <br />communication, fiber optics, or other wirelines, pipelines and other facilities upon, along or across any or <br />all parts of its property, all or any of which may be freely done at any time or times by Licensor without <br />liability to Licensee or to any other party for compensation or damages. <br />B. The foregoing grant is also subject to all outstanding superior rights (including those in <br />favor of licensees and lessees of Railroad Property) and the right of Licensor to renew and extend the <br />same, and is made without covenant of title or for quiet enjoyment. It shall be Licensee's sole obligation <br />to obtain such additional permission, license and grants necessary on account of any such existing rights. <br />Section 2. ENGINEERING REQUIREMENTS; PERMITS. <br />A. Licensee's Facilities will be designed, constructed, operated, maintained, repaired, <br />renewed, modified, reconstructed, removed, or abandoned in place on Railroad Property by Licensee or <br />its contractor to Licensor's satisfaction and in strict conformity with: (i) Licensor's current engineering <br />standards and specifications, including those for shoring and cribbing to protect Licenser's railroad <br />operations and facilities ("UP Specifications"), except for variances approved in advance in writing by <br />Licensor's Assistant Vice President Engineering — Design or its authorized representative ("UP <br />Engineering Representative"); (ii) such other additional safety standards as Licensor, in its sole discretion, <br />elects to require, including, without limitation, American Railway Engineering and Maintenance -of -Way <br />Association ("AREMA") standards and guidelines (collectively, "UP Additional Requirements"); and (iii) <br />all applicable laws, rules, and regulations, including any applicable Federal Railroad Administration and <br />Federal Energy Regulatory Commission regulations and enactments (collectively, "Laws"). If there is <br />any conflict between UP Specifications, UP Additional Requirements, and Laws, the most restrictive will <br />apply. <br />B. Licensee shall keep the soil over Licensee's Facilities thoroughly compacted, and <br />maintain the grade over and around Licensee's Facilities even with the surface of the adjacent ground. <br />C. If needed, Licensee shall secure, at Licensee's sole cost and expense, any and all <br />necessary permits required to perform any work on Licensee's Facilities. <br />Section 3. NOTICE OF COMMENCEMENT OF WORK; EMERGENCIES. <br />A. Licensee and its contractors are strictly prohibited from commencing any work associated <br />with Licensee's Facilities without Licensor's written approval that the work will be in strict compliance <br />with the "ENGINEERING REQUIREMENTS; PERMITS" Section of this Exhibit B. Upon Licensor's <br />approval, Licensee shall contact both of Licensor's field representatives ("Licensor's Field <br />Representatives") at least ten (10) days before commencement of any work on Licensee's Facilities. <br />REV: 02-19-21 RL <br />ATN/AGR.2021.037/UPRR (Sobrato Recycled Water Main Crossing) (Page 7 of 15) <br />