Laserfiche WebLink
VETERANS MEMORIAL BUILDING/SENIOR CENTER —YMCA JOINT PROJECT— PHASE 1 <br />REDWOOD CITY, CA <br />SCHEDULE OF BID PRICES <br />All Bid items, including lump sums, unit prices and alternates (if any), must be filled in completely. Bid items <br />are described in Section 01 1100 (Summary of Work). Quote in figures only, unless words are specifically <br />requested. <br />51 ,_ LVTI Oo0 <br />In case of discrepancy between the Unit Price and the Total Item Cost set forth for a unit basis item, the <br />unit price shall prevail and shall be utilized as the basis for determining the lowest responsive, responsible <br />Bidder. However, if the amount set forth as a unit price is ambiguous, unintelligible or uncertain for any <br />cause, or is omitted, or is the same amount as the entry in the "Total Item Cost" column, then the amount <br />set forth in the "Total Item Cost" column for the item shall prevail and shall be divided by the estimated <br />quantity for the item and the price thus obtained shall be the Unit Price. <br />For purposes of evaluating Bids, the City will correct any apparent errors in the extension of unit prices and <br />any apparent errors in the addition of lump sum and extended prices. <br />ALTERNATE <br />NO. <br />DESCRIPTION <br />ESTIMATED <br />A.1 <br />UNIT PRICE <br />f <br />ITEM <br />DESCRIPTION <br />QUANTITY <br />UNIT <br />Linear Wood Ceilings <br />TOTAL ITEM <br />A.4 <br />Exterior Pedestrian Paving <br />$ <br />A.5 <br />Exhibit Pylons and Kiosks <br />COST <br />A.6 <br />Microgrid <br />$ <br />A.7 <br />TOTAL BID <br />$ <br />(3C5u,a0o <br />TOTAL <br />BASE BID <br />N/A <br />N/A <br />PRICE <br />$ <br />51 ,_ LVTI Oo0 <br />In case of discrepancy between the Unit Price and the Total Item Cost set forth for a unit basis item, the <br />unit price shall prevail and shall be utilized as the basis for determining the lowest responsive, responsible <br />Bidder. However, if the amount set forth as a unit price is ambiguous, unintelligible or uncertain for any <br />cause, or is omitted, or is the same amount as the entry in the "Total Item Cost" column, then the amount <br />set forth in the "Total Item Cost" column for the item shall prevail and shall be divided by the estimated <br />quantity for the item and the price thus obtained shall be the Unit Price. <br />For purposes of evaluating Bids, the City will correct any apparent errors in the extension of unit prices and <br />any apparent errors in the addition of lump sum and extended prices. <br />ALTERNATE <br />NO. <br />DESCRIPTION <br />ALTERNATE PRICE ($) <br />A.1 <br />Media Wall <br />$ <br />ut�>0, OGGi <br />A.2 <br />Terrazzo <br />$ <br />000 <br />A.3 <br />Linear Wood Ceilings <br />$ oVU <br />A.4 <br />Exterior Pedestrian Paving <br />$ <br />A.5 <br />Exhibit Pylons and Kiosks <br />$ <br />A.6 <br />Microgrid <br />$ <br />A.7 <br />Gateway Trellis <br />$ <br />(3C5u,a0o <br />A.8 <br />Building PV Panels <br />$ <br />A.9 <br />Gymnasium <br />$ 1 ` I -Lu010 0-0) 00,0) <br />l <br />A.10.A <br />Cedar <br />$ <br />�}col <br />A.10.6 <br />Thermally Modified Wood <br />$ <br />5. The undersigned acknowledges that the Apparent Low Bidder will be determined as provided in <br />Documents 00 1113 (Notice to Bidders) and Document 00 2113 (Instruction to Bidders). <br />6. Subcontractors for work are listed on Document 00 4314 (Subcontractors List), submitted herewith. <br />7. The undersigned Bidder understands that City reserves the right to reject this Bid. <br />8. If written notice of the acceptance of this Bid, hereinafter referred to as Notice of Award, is mailed <br />or delivered to the undersigned Bidder within the time described in Paragraph 2 of this Document <br />Bid Set: 2021-03-24 <br />BID FORM <br />004113-2 <br />