My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt21 Thompson Builders Corporation
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2021
>
Agmt21 Thompson Builders Corporation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2021 3:07:57 PM
Creation date
7/21/2021 3:05:10 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Thompson Builders Corporation
PROJECT NAME
Veterans Memorial Building Senior Center Project
RMP File Number
304
Date
7/19/2021
MO Ref
21-093
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
VETERANS MEMORIAL BUILDING/SENIOR CENTER —YMCA JOINT PROJECT— PHASE 1 <br />REDWOOD CITY, CA <br />SCHEDULE OF BID PRICES <br />All Bid items, including lump sums, unit prices and alternates (if any), must be filled in completely. Bid items <br />are described in Section 01 1100 (Summary of Work). Quote in figures only, unless words are specifically <br />requested. <br />51 ,_ LVTI Oo0 <br />In case of discrepancy between the Unit Price and the Total Item Cost set forth for a unit basis item, the <br />unit price shall prevail and shall be utilized as the basis for determining the lowest responsive, responsible <br />Bidder. However, if the amount set forth as a unit price is ambiguous, unintelligible or uncertain for any <br />cause, or is omitted, or is the same amount as the entry in the "Total Item Cost" column, then the amount <br />set forth in the "Total Item Cost" column for the item shall prevail and shall be divided by the estimated <br />quantity for the item and the price thus obtained shall be the Unit Price. <br />For purposes of evaluating Bids, the City will correct any apparent errors in the extension of unit prices and <br />any apparent errors in the addition of lump sum and extended prices. <br />ALTERNATE <br />NO. <br />DESCRIPTION <br />ESTIMATED <br />A.1 <br />UNIT PRICE <br />f <br />ITEM <br />DESCRIPTION <br />QUANTITY <br />UNIT <br />Linear Wood Ceilings <br />TOTAL ITEM <br />A.4 <br />Exterior Pedestrian Paving <br />$ <br />A.5 <br />Exhibit Pylons and Kiosks <br />COST <br />A.6 <br />Microgrid <br />$ <br />A.7 <br />TOTAL BID <br />$ <br />(3C5u,a0o <br />TOTAL <br />BASE BID <br />N/A <br />N/A <br />PRICE <br />$ <br />51 ,_ LVTI Oo0 <br />In case of discrepancy between the Unit Price and the Total Item Cost set forth for a unit basis item, the <br />unit price shall prevail and shall be utilized as the basis for determining the lowest responsive, responsible <br />Bidder. However, if the amount set forth as a unit price is ambiguous, unintelligible or uncertain for any <br />cause, or is omitted, or is the same amount as the entry in the "Total Item Cost" column, then the amount <br />set forth in the "Total Item Cost" column for the item shall prevail and shall be divided by the estimated <br />quantity for the item and the price thus obtained shall be the Unit Price. <br />For purposes of evaluating Bids, the City will correct any apparent errors in the extension of unit prices and <br />any apparent errors in the addition of lump sum and extended prices. <br />ALTERNATE <br />NO. <br />DESCRIPTION <br />ALTERNATE PRICE ($) <br />A.1 <br />Media Wall <br />$ <br />ut�>0, OGGi <br />A.2 <br />Terrazzo <br />$ <br />000 <br />A.3 <br />Linear Wood Ceilings <br />$ oVU <br />A.4 <br />Exterior Pedestrian Paving <br />$ <br />A.5 <br />Exhibit Pylons and Kiosks <br />$ <br />A.6 <br />Microgrid <br />$ <br />A.7 <br />Gateway Trellis <br />$ <br />(3C5u,a0o <br />A.8 <br />Building PV Panels <br />$ <br />A.9 <br />Gymnasium <br />$ 1 ` I -Lu010 0-0) 00,0) <br />l <br />A.10.A <br />Cedar <br />$ <br />�}col <br />A.10.6 <br />Thermally Modified Wood <br />$ <br />5. The undersigned acknowledges that the Apparent Low Bidder will be determined as provided in <br />Documents 00 1113 (Notice to Bidders) and Document 00 2113 (Instruction to Bidders). <br />6. Subcontractors for work are listed on Document 00 4314 (Subcontractors List), submitted herewith. <br />7. The undersigned Bidder understands that City reserves the right to reject this Bid. <br />8. If written notice of the acceptance of this Bid, hereinafter referred to as Notice of Award, is mailed <br />or delivered to the undersigned Bidder within the time described in Paragraph 2 of this Document <br />Bid Set: 2021-03-24 <br />BID FORM <br />004113-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.