My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt21 Environmental Science Associates
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2021
>
Agmt21 Environmental Science Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2021 8:56:10 AM
Creation date
8/17/2021 8:55:26 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Environmental Science Associates
PROJECT NAME
Agreement for Services (Gatekeeper)
RMP File Number
304
Date
6/28/2021
MO Ref
21-113
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1001 Galaxy Way <br />Suite 310 <br />Concord CA 94520 <br /> 925.949.5800 phone <br />530.756.5991 fax <br />westyost.com <br /> <br /> <br /> <br />June 18, 2021 SENT VIA: EMAIL <br /> <br /> <br />Karl Heisler <br />Senior Technical Associate <br />Environmental Science Associates <br />550 Kearny Street, Suite 800 <br />San Francisco, CA 94108 <br /> <br />SUBJECT: Water and Recycled Water Utilities Evaluation for the Gatekeeper Project <br /> <br />Dear Karl, <br />The purpose of this letter proposal is to provide Environmental Science Associates with a proposed Scope <br />of Services, Budget and Schedule related to the facilities evaluation for Redwood City’s (City’s) Gatekeeper <br />Project (Project). <br />The Project is a collection of six (6) separate projects that are located in the Downtown area. These <br />projects include: <br />• 652 El Camino Real <br />• 901-999 El Camino Real <br />• 2300 Broadway <br />• 603 Jefferson/750 Bradford <br />• 1900 Broadway <br />• 601 Allerton <br />Located in the Downtown area on the south side of the Caltrain tracks, the project site includes <br />approximately seven (7) parcels and comprises approximately 15.5 acres. The preliminary plans for each of <br />these projects include a combination commercial and residential development. <br />The purpose of the facilities analysis is to review locations and sizing of potable and recycled water utilities, <br />in accordance with the City Engineering Standards to identify impacts of the proposed development on each <br />of the utility systems, and to identify improvements required to mitigate those impacts. <br /> <br />REV: 06-23-21 MI <br />ATTY/AGR.2021.150/Environmental Sciences Associates (Gatekeeper Projects) (Page 51 of 58)
The URL can be used to link to this page
Your browser does not support the video tag.