My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt21 Environmental Science Associates
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2021
>
Agmt21 Environmental Science Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2021 8:56:10 AM
Creation date
8/17/2021 8:55:26 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Environmental Science Associates
PROJECT NAME
Agreement for Services (Gatekeeper)
RMP File Number
304
Date
6/28/2021
MO Ref
21-113
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(Effective January 1, 2021 through December 31, 2021)* <br />POSITIONS <br />ENGINEERING <br />Principal/Vice President $307 <br />Engineer/Scientist/Geologist Manager I / II $291 /$304 <br />Principal Engineer/Scientist/Geologist I / II $263 /$279 <br />Senior Engineer/Scientist/Geologist I / II $236 /$247 <br />Associate Engineer/Scientist/Geologist I / II $202 /$216 <br />Engineer/Scientist/Geologist I / II $162 /$188 <br />Engineering Aide $95 <br />Administrative I / II / III / IV $83 /$105 /$126 /$139 <br />ENGINEERING TECHNOLOGY <br />Engineering Tech Manager I / II $302 /$304 <br />Principal Tech Specialist I / II $277 /$287 <br />Senior Tech Specialist I / II $254 /$266 <br />Senior GIS Analyst $230 <br />GIS Analyst $217 <br />Technical Specialist I / II / III / IV $162 /$185 /$208 /$232 <br />Technical Analyst I / II $116 /$139 <br />Technical Analyst Intern $94 <br />Cross-Connection Control Specialist I / II / III / IV $121 /$131 /$147 /$164 <br />CAD Manager $183 <br />CAD Designer I / II $142 /$160 <br />CONSTRUCTION MANAGEMENT <br />Senior Construction Manager $294 <br />Construction Manager I / II / III / IV $179 /$192 /$204 /$258 <br />Resident Inspector (Prevailing Wage Groups 4 / 3 / 2 / 1)$157 /$174 /$194 /$202 <br />Apprentice Inspector $142 <br />CM Administrative I / II $76 /$102 <br />Field Services $202 <br />LABOR CHARGES <br />(DOLLARS PER HOUR) <br />■ Hourly rates include Technology and Communication charges such as general and CAD computer, software, <br /> telephone, routine in-house copies/prints, postage, miscellaneous supplies, and other incidental project expenses. <br />■ Outside Services such as vendor reproductions, prints, shipping, and major West Yost reproduction efforts, as well as <br /> Engineering Supplies, etc. will be billed at actual cost plus 15%. <br />■ The Federal Mileage Rate will be used for mileage charges and will be based on the Federal Mileage Rate applicable to <br /> when the mileage costs were incurred. Travel other than mileage will be billed at cost. <br />■ Subconsultants will be billed at actual cost plus 10%. <br />■ Expert witness, research, technical review, analysis, preparation and meetings billed at 150% of standard hourly rates. Expert <br /> witness testimony and depositions billed at 200% of standard hourly rates. <br />■ A Finance Charge of 1.5% per month (an Annual Rate of 18%) on the unpaid balance will be added to invoice amounts <br /> if not paid within 45 days from the date of the invoice. <br />2021 Billing Rate Schedule <br />* This schedule is updated annually Page 1 of 2REV: 06-23-21 MI <br />ATTY/AGR.2021.150/Environmental Sciences Associates (Gatekeeper Projects) (Page 57 of 58)
The URL can be used to link to this page
Your browser does not support the video tag.