My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt21 Reimbursement Lane 1900 Broadway
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2021
>
Under $100K
>
Agmt21 Reimbursement Lane 1900 Broadway
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2021 10:53:06 AM
Creation date
8/20/2021 10:53:01 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Lane 1900 Broadway
PROJECT NAME
Reimbursement Agreement between the City of Redwood City and Lane 1900 Broadway Owner
RMP File Number
304.5
Date
8/11/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 07-29-2021 VR <br />(b) On a monthly basis, City will provide to Developer a summary report on <br />the fees incurred by City's team of consultants and City staff, the percentage of the deposit that has <br />been expended by City on its evaluation of the Project, and the amount remaining available for <br />billing. <br />Section 4.02. CEQA Non-Refundable Deposit. <br />(a) Developer’s Project is located within the Downtown Precise Plan (“DTPP”). The <br />City will conduct a programmatic level environmental review for amendments to the DTPP that <br />will consider Developer’s Project and five other projects in the DTPP (“DTPP CEQA Review”). <br />Because five of the projects are generally of similar size and one is smaller, the costs of the DTPP <br />CEQA Review will be split such that the five similar size projects, of which Developer’s Project <br />is one, will each pay 18 percent and the one smaller project will pay 10 percent of the DTPP CEQA <br />Review costs. <br />(b) On June 28, 2021, the City Council approved an Agreement for Services with <br />Environmental Science Associates (“ESA”) for an amount not to exceed Seven Hundred Seventy- <br />Five Thousand Two Hundred and Twenty-Two Dollars ($775,222) for the DTPP CEQA Review <br />(“ESA Scope”). In addition to the ESA Scope, the cost of the DTPP CEQA Review will include <br />among other things time spent by City staff, consultants, and special legal counsel for an <br />anticipated total cost of One Million Twenty Thousand Dollars ($1,020,000) (the “Anticipated <br />CEQA Costs”). On or before the Effective Date, Developer shall pay to the City a non-refundable <br />amount equal to 18 percent of the Anticipated CEQA Costs or One Hundred Eighty-Three <br />Thousand Six Hundred Dollars ($183,600) in the form of a wire transfer of good funds. <br />(c) In the event that DTPP CEQA Review costs increase beyond the Anticipated <br />CEQA Costs, Developer agrees to pay any additional costs in accordance with the percentages <br />identified in (a) above. Notwithstanding the foregoing, Developer agrees that should any of the <br />other projects withdraw, Developer will pay an equivalent share of the additional DTPP CEQA <br />Review costs with the remaining applicants. For example, if one of the five similar size project <br />withdraws its application, the four remaining projects will each pay one-fourth of 90 percent of <br />the additional costs; however, if the smaller project withdraws, each of the remaining projects will <br />each pay one-fifth of 100 percent of the additional costs. <br />Section 4.03. Evergreen Deposit and CEQA Deposit. <br />(a) City shall establish and Developer shall fund a deposit account designed to <br />ensure that City is never required to perform work for which reimbursement funds have not been <br />previously deposited (“Evergreen Deposit”). The Evergreen Deposit shall contain funds necessary <br />to cover three months’ worth of budgeted expenditures by City relating to City’s review, <br />evaluation, consideration, and processing of the Project (including any project specific CEQA <br />review necessary for such review, evaluation, consideration, and processing). Developer shall <br />fund the Evergreen Deposit initially by depositing with City on or before the Effective Date the <br />sum of Fifty Thousand Dollars ($50,000) in the form of a wire transfer of good funds. Developer <br />shall replenish the Evergreen Deposit on a monthly basis until termination of this Agreement <br />pursuant to Section 2.02 or Section 5.03 or as long as expenditures made by City relating to City’s <br />review, evaluation, consideration, and processing of Developer’s proposal for the Project remain <br />ATTY/AGR.2021.201/Lane 1900 Broadway Owner (Page 3 of 9)
The URL can be used to link to this page
Your browser does not support the video tag.