Laserfiche WebLink
EL CAMINO REAL <br />GRAPHIC SCALE <br />0 10 20 <br />CALTRANS RIGHT OF WAY <br />I <br />l _ I <br />I <br />I <br />I FLOW-THROUGH PLANTER <br />SURFACE AREA = 266 SF <br />I MIN. PONDING DEPTH = 2.13" <br />0 Z W TREATMENT VOL. = 386 CU.FT. r <br />Z) <br />Y Z I <br />W <br />l <br />STORM DRAIN POINT } <br />OF CONNECTION i <br />DETENTIONVAULT <br />885 CU.FT. REQUIRED <br />900 CU.FT. PROVIDED <br />EXHIBIT B1 <br />a� TALUS STORM WATER MAINTENANCE AGREEMENT <br />zo <br />ENGIIiEERIN61 PLANNING DEVELOPMENT 1304 EL CAMI Na REAL <br />os Job No.: 18255 Date: 05/21/21 Sheet: 1 of 1 <br />ATTY/AGR.2021 219/South Main (Page 11 of 19) <br />