My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt21 1304 GS HIP 1304 ECR, LP
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2021
>
Under $100K
>
Agmt21 1304 GS HIP 1304 ECR, LP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2021 3:22:14 PM
Creation date
9/29/2021 3:16:07 PM
Metadata
Fields
Template:
Agreement
Contractor Name
1304 GS HIP 1304 ECR, LP
PROJECT NAME
Public Access Easement Deed
RMP File Number
304.5
Date
9/23/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT C <br />1304 EI Camino Real <br />Storm Water Treatment Operation and Maintenance <br />Inspection Report to the City of Redwood City, California <br />This report and attached Inspection and Maintenance Checklists document the inspection and <br />maintenance conducted for the identified storm water treatment measure(s) subject to the <br />Maintenance Agreement between the City and the property owner during the annual reporting <br />period indicated below. <br />Property Information: <br />Property Address or APN <br />053-063-07 <br />Property Owner: Gre star GP 11 LLC <br />II. Contact Information: <br />Name of person to contact regarding this report: Jonathan Fearn <br />Contact Number: 415 489-3906 Email:_jonathanrfearn@greystar.com <br />Address to which correspondence regarding this report should be directed: <br />450 Sansome Street Suite 500 <br />San Francisco CA 94111 <br />III. Reporting Period: <br />This report, with the attached completed inspection checklists, documents the inspections and <br />maintenance of the identified treatment measures during the time period from: <br />to <br />IV. Storm Water Treatment Measure Information: <br />The following storm water treatment measures (identified treatment measures) are located on <br />the property identified above and are subject to the Maintenance Agreement: <br />Treatment Device <br />Type of Treatment <br />Location <br />Flow-through Treatment <br />Planter <br />Bio -treatment <br />Second level <br />Detention Vault <br />N/A <br />Under Parking Garage <br />Page 1 O&M Inspection Report <br />ATTY/AGR.2021.219/South Main (Page 13 of 19) <br />
The URL can be used to link to this page
Your browser does not support the video tag.