My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt21_Animal Control
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2021
>
Under $100K
>
Agmt21_Animal Control
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2021 4:30:32 PM
Creation date
9/29/2021 4:29:47 PM
Metadata
Fields
Template:
Agreement
Contractor Name
San Mateo County
PROJECT NAME
Animal Control Agreement between San Mateo County and the Cities
RMP File Number
304.5
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
18 <br /> <br />Section VIII. Billing Procedures and Tracking Information <br />A. Tracking Information <br />1. Because a large percentage of work performed by Facilities Services is <br />associated with building systems and structures, baseline services are tracked by <br />building rather than by individual department. Facilities Services staff will record <br />labor and material costs for each activity performed in a building, and these costs <br />are then reflected in the report sent quarterly to the Contractor and the Animal <br />Control Manager, San Mateo County Health. Contractor will be charged for <br />services rendered on an ongoing basis and not based on a predetermined <br />amount. <br />2. The cost for additional services is tracked by work authorization. Prior to <br />receiving a service, the Contractor will set aside a dollar amount equal to the <br />estimated cost for that service. As services are rendered and costs are incurred, <br />the invoices will be sent to County Health System Animal Control Manager and <br />then to the Contractor. The cost will be taken out of animal control Contract <br />Funds by the Contractor, who will pay the invoice within 30 calendar days or the <br />County will deduct the overdue amount from Contractor's next payment. <br />3. If there ls a dispute raised by Contractor, within three business days of receipt of <br />the Invoice, regarding the accuracy of charges in an invoice, the parties shall use <br />best efforts to resolve the dispute expeditiously. If while using best efforts, the <br />parties have not resolved the dispute within 30 calendar days, Contractor shall <br />not be in breach if the parties agree that they are working in good faith to resolve <br />the dispute. <br /> <br />B. Building Manuals, Drawings, Training <br />In preparation for this, Contractor is to receive copies of all warranties, as-builts, operating and <br />maintenance materials, and is to participate in all trainings provided by the Shelter's general <br />contractor to DPW for the systems that Contractor will be maintaining. The intent is to have <br />Contractor be informed as much as possible to more efficiently assist DPW in its role as well as <br />manage its own responsibilities. <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.