Laserfiche WebLink
<br />ATTleHMElf. <br /> <br />~3 <br /> <br />78 <br />Page 26 <br /> <br /> <br />Policy BE-22.2: <br /> <br />Apply the following performance criteria and standards, as applicable, to all <br />new development projects, with the level of application commensurate with <br />the scale of development: <br /> <br />· The development must result in a net positive fiscal impact to the <br />City unless the City Council identifies unique circumstances for <br />waiving this requirement. <br /> <br />· Adequate long-term water supplies must be available to serve the <br />new development without impinging upon service to established <br />and approved uses and developments. Adequacy must be fully <br />documented to the satisfaction of the responsible Citv deoartments. <br />tRese responsiBle f.or imf)lemeAtiAg the City's lJrBaA '.Vater <br />MaAagement PlaA aR~/er aRY 5\:1BSe(;1l:AeAt regl:AlatQry aecl:Aments <br />pertaining te '.vater sl:Af:lf)ly. <br /> <br />· The City's adopted service standards for pedestrian, bicycle, public <br />transit usage, and motorized vehicle mobility must be achieved. Any <br />circulation improvements or programs needed to maintain the <br />established level of service standard must be programmed and <br />funding committed": for construction or implementation at the <br />aporooriate time. <br /> <br />· New development must plan for access to public transportation, <br />including the potential streetcar system, transportation hub, and <br />ferry terminal, as appropriate. <br /> <br />· Storm drain, sewerage, and similar infrastructure improvements <br />necessary to serve the development must be fully funded at the <br />appropriate time. and any such improvements shall not place <br />burdens upon nor otherwise impact tributary facilities. <br /> <br />· Sufficient measures must be incorporated into project design and <br />fully funded at the tif:Re-appropriate time to guard against potential <br />damage from anticipated rises in sea levels. <br /> <br />--Minimize Ne-direct or indirect impact to sensitive biological <br />resources while optimizin~ the potential for impact shall res\:Ilt <br />'.\'ithQ~t cemf)reReAsive mitigation. In l3artfcl:-Jlar, meaSl:Ares mtJst Be <br />takeR te f)retect '.\'etlaA~5. <br /> <br />· Uses proposed must clearly be compatible with surrounding <br />established and planned uses, and no extraordinary measures can <br />be pursued merely to achieve the compatibility requirement. <br />