17060 P a g e | 1 <br />Proposal for Storm Drain Pump Station Improvements Projects <br />BRADFORD PUMP STATION <br />Consultant will perform design of improvements for the Bradford Storm Drainage Pump Station Improvement <br />Project and for approximately 3,900 lineal feet of storm drain pipe near the pump station.. Consultant will provide <br />civil, mechanical, structural, hydraulic and hydrology engineering, surveying, as well as all project management <br />services. Consultant will also manage the subconsultant team comprised of: <br />1. Horizon Water and Environment (Horizon) - environmental specialist subconsultant <br />2. Northwest Hydraulic Consultants (NHC) - hydraulic modeling subconsultant <br />3. Subtronic - utilities locating subconsultant <br />4. Corrpro - corrosion engineering subconsultant <br />5. TJCAA - electrical integration and controls engineering subconsultant <br />6. GSB Architecture - architectural subconsultant <br />If substitution, addition, or deletion of any of the subconsultant firms is desired, Consultant will issue a written <br />request to the City and the team change will only occur under written authorization by the City Engineer. <br />SCOPE OF WORK <br />Task 1 – Project Management <br />The Consultant will provide the project management and coordination necessary to design, bid, construct, and <br />perform startup and commissioning of the Bradford Pump station. As show on Attachment 1 to this Exhibit A, the <br />design phase is scheduled to be 8 months in duration with 100% final design completion by June 1, 2022. Design <br />will be followed by a 45-day bid and contractor selection phase, and construction occurring in the fall of 2022 <br />through winter of 2023. <br />Task 1.1 – Facilitate and Attend Kickoff Meeting <br />A kick-off meeting with the City and other stakeholders will be held. The Consultant will attend this meeting and <br />prepare an agenda of discussion topics. Meeting minutes summarizing the items discussed, as well as a list of <br />action items assigned, will be prepared by the prime consultant. The Consultant Principal-in-charge and Project <br />Manager will attend the kick-off meeting. The overall project objectives, schedule, deliverables, and work plan will <br />be discussed. <br />Task 1.2 – Perform Routine Coordination <br />Under this task, the Consultant will perform routine coordination with the City, stakeholders, subconsultants and its <br />internal team in order to facilitate design of the pump station improvements. Bi-weekly progress update emails will <br />be dispersed the City project management team throughout the design phase of the project. <br />Task 1.3 – Prepare Monthly Status Reports and Invoicing <br />At the end of each month, the Consultant will prepare a budget/status report outlining the work items performed <br />during the reporting period; budget, schedule, and work progress with respect to the project baseline; and a <br />discussion of upcoming activities scheduled to occur in the subsequent work period. A monthly invoice will be <br />provided with the budget/status report which will include billing for the month, project billing total to date, and <br />remaining budget. Regular coordination with the City, sub-consultants and other stakeholders, is included as a part <br />of this task. <br />ATTY/AGR.2021.257/Wood Rodgers, Inc. (Bradford Storm Drain Pump Station Design) (Page 12 of 40)