My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt21 Wood Rodgers, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2021
>
Agmt21 Wood Rodgers, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2021 3:46:23 PM
Creation date
10/18/2021 3:45:27 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Wood Rogers, Inc.
PROJECT NAME
Bradford Storm Drain Pump Station Project
RMP File Number
304
Date
10/18/2021
MO Ref
21-180
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
17060 P a g e | 10 <br />Proposal for Storm Drain Pump Station Improvements Projects <br />BRADFORD PUMP STATION <br />Drawing Set Sheet Count - Br adford Pump St ation <br />1 Ti tl e Sheet, I ndex, Loc a ti on a nd Vi ci ni ty Ma p <br />2 Gener a l Notes , Abbr evi a ti ons a nd Legend <br />3 Surveyi ng Control <br />4 Overa l l Si te Pl a n - Br a dford PS <br />5 Ci vi l Si te Pl a n - Br a dford PS <br />6 Ci vi l Secti on a nd Deta i l s 1 of 2 <br />7 Ci vi l Secti on a nd Deta i l s 2 of 2 <br />8 Str uctura l Pl a n, Sec ti ons , a nd Deta i l s 1 of 2 <br />9 Str uctura l Pl a n, Sec ti ons , a nd Deta i l s 2 of 2 <br />10 Pump Sta ti on Founda ti on Pl a n <br />11 Pump Sta ti on Deck Pl a n <br />12 Pump Sta ti on Longi tudi na l Sec ti ons <br />13 Pump Sta ti on Tra vers e Secti ons <br />14 Pump Sta ti on Deta i l s <br />15 Pump Sta ti on Tra s h Ra ck Deta i l s <br />16 Pump Sta ti on Peri meter Fenc e Deta i l s <br />17 Pump Sta ti on - Mec ha ni ca l Top a nd Bottom Pl a ns <br />18 Pump Sta ti on - Mec ha ni ca l Sec ti ons <br />19 Tra s h Ra ck - Secti ons a nd Deta i l s <br />20 El ec tr i c a l Legend a nd Abbrevi a ti on <br />21 El ec tr i c a l Sta nda r d Deta i l s <br />22 Stor mwa ter Pump Sta ti on 1 -l i ne, El eva ti on, a nd Groundi ng Sc hema ti c <br />23 Stor mwa ter Pump Sta ti on Power Pl a n <br />24 Stor mwa ter Pump Sta ti on Li ghti ng Pl a n <br />25 El ec tr i c a l s c hedul es a nd i nterc onnec ti on Di a gra m <br />26 Pump Contr ol Sc hema ti c <br />27 SCADA Sys tem Network Di a gr a m (Pa r ti a l ) <br />28 Contr ol Pa nel El eva ti on <br />29 Sa mpl e W i r i ng Di a gr a ms <br />30 Ca thodi c Pr otecti on Pl a n <br />31 Ca thodi c Pr otecti on Secti ons <br />32 Ca thodi c Pr otecti on Rec ti fi er Deta i l s <br />33 Ca thodi c Pr otecti on Anode Deta i l s ELECTRICAL SHEETSCIVIL SHEET COUNT <br />GENERALSTRUCTMECHCATHODIC PROTECTION Figure 3: Assumed Plan Set Sheet Count <br />Task 4 - Prepare 60%, 90%, 100 Plans, Specifications, and Cost Estimates <br />Design documents will be prepared by the consultant team at the 60%, 90%, 100% (Final) Design levels and <br />submitted to the City and any other approval agencies or stakeholder interests for review and comment. <br />Comments from all reviewing agencies will be addressed and responded to prior to the subsequent resubmittal by <br />ATTY/AGR.2021.257/Wood Rodgers, Inc. (Bradford Storm Drain Pump Station Design) (Page 21 of 40)
The URL can be used to link to this page
Your browser does not support the video tag.