My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt21 Wood Rodgers, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2021
>
Agmt21 Wood Rodgers, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2021 3:46:23 PM
Creation date
10/18/2021 3:45:27 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Wood Rogers, Inc.
PROJECT NAME
Bradford Storm Drain Pump Station Project
RMP File Number
304
Date
10/18/2021
MO Ref
21-180
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ID Task Name Duration Start Finish <br />1 NTP 0 days Fri 10/15/21 Fri 10/15/21 <br />2 Task 1: Project Management 200 days Fri 10/15/21 Thu 7/21/22 <br />3 1.1 Facilitate and Attend Kick-off Meeting 1 day Fri 10/15/21 Fri 10/15/21 <br />4 1.2 Perform Routine Coordination 200 days Fri 10/15/21 Thu 7/21/22 <br />5 1.3 Prepare Monthly Status Reports and Invoicing 200 days Fri 10/15/21 Thu 7/21/22 <br />6 1.4 Attend Project Coordination Meetings with City 200 days Fri 10/15/21 Thu 7/21/22 <br />7 1.5 Grant Support Meeting 1 day Mon 12/13/21 Mon 12/13/21 <br />8 1.6 Constructability and Value Engineering Review 1 day Mon 3/28/22 Mon 3/28/22 <br />9 Task 2: Surveying & Utilities Research & Geotechnical Investigation Report154 days Tue 10/19/21 Fri 5/20/22 <br />10 2.1 Gather and Review Utilities Information (City to Provide)1 day Fri 10/22/21 Fri 10/22/21 <br />11 2.2 Utility Locating 2 days Mon 10/25/21 Tue 10/26/21 <br />12 2.3 Gather and Review City SCADA and System Info 10 days Fri 10/22/21 Thu 11/4/21 <br />13 2.4 Perform Topographic Surveying and Mapping 2 days Wed 10/27/21 Thu 10/28/21 <br />14 2.5 Perform Potholing for Existing Utilities 5 days Tue 11/2/21 Mon 11/8/21 <br />15 2.6 Obtain ROW and Preliminary Title Reports (City to pay fees)5 days Tue 10/19/21 Mon 10/25/21 <br />16 2.7 Develop Survey Base Map 2 days Thu 11/11/21 Fri 11/12/21 <br />17 Survey Base Map 0 days Fri 11/12/21 Fri 11/12/21 <br />18 2.8 Perform Geotechnical Investigations and Analysis 40 days Mon 11/22/21 Fri 1/14/22 <br />19 *Geotechnical Report 0 days Fri 1/14/22 Fri 1/14/22 <br />20 2.9 Pump Station Physical Hydraulic Model 90 days Mon 1/17/22 Fri 5/20/22 <br />21 *Hydraulic Model Tech Memo 0 days Fri 5/20/22 Fri 5/20/22 <br />22 2.10 Environmental Compliance Memo 10 days Fri 10/22/21 Thu 11/4/21 <br />23 Task 3: Alternatives Analysis and Preliminary Engineering Report 45 days Mon 11/15/21 Mon 1/17/22 <br />24 3.1 Alternatives Analysis 20 days Mon 11/15/21 Fri 12/10/21 <br />25 * Alternatives Analysis Tech Memo 0 days Wed 12/1/21 Wed 12/1/21 <br />26 City Review of Alternatives Analyis 5 days Mon 12/13/21 Fri 12/17/21 <br />27 3.2 Preliminary Engineering Report (Basis of Design Report)20 days Mon 12/13/21 Fri 1/7/22 <br />28 *Preliminary Engineering Report 0 days Mon 1/17/22 Mon 1/17/22 <br />29 City Review of Preliminary Engineering Report 5 days Mon 1/10/22 Fri 1/14/22 <br />30 Task 4: Prepare 60%, 90%, 100% (Final) Plans, Specs., & Cost Est.130 days Mon 1/17/22 Fri 7/15/22 <br />31 4.1 Prepare 60% Plans, Specifications, and Cost Estimates 50 days Mon 1/17/22 Fri 3/25/22 <br />32 *60% PS&E 0 days Fri 3/25/22 Fri 3/25/22 <br />33 City Review of 60% PS&E 5 days Mon 3/28/22 Fri 4/1/22 <br />34 4.2 Prepare 90% Plans, Specifications, and Cost Estimates 25 days Mon 4/4/22 Fri 5/6/22 <br />35 *90% PS&E 0 days Fri 5/6/22 Fri 5/6/22 <br />36 City Review of 90% PS&E 5 days Mon 5/9/22 Fri 5/13/22 <br />37 4.3 Prepare 100% (Final) Plans, Specifications, & Cost Estimates 10 days Mon 5/16/22 Fri 5/27/22 <br />38 *100% PS&E 0 days Wed 6/1/22 Wed 6/1/22 <br />39 4.4 Conformed Set of Plans and Specifications 5 days Mon 7/11/22 Fri 7/15/22 <br />40 Task 6: Bidding Phase Services 30 days Mon 5/30/22 Fri 7/8/22 <br />41 6.1 Provide Bidding and Selection Support 30 days Mon 5/30/22 Fri 7/8/22 <br />10/15 <br />11/12 <br />1/14 <br />5/20 <br />12/1 <br />1/17 <br />3/25 <br />5/6 <br />6/1 <br />Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug <br />2022 <br />Task <br />Split <br />Milestone <br />Summary <br />Project Summary <br />External Tasks <br />External Milestone <br />Inactive Task <br />Inactive Milestone <br />Inactive Summary <br />Manual Task <br />Duration-only <br />Manual Summary Rollup <br />Manual Summary <br />Start-only <br />Finish-only <br />Deadline <br />Progress <br />Manual Progress <br />City of Redwood City - Bradford Pump Station Design Schedule - Tue 9/28/21 Update <br />* Deliverable milestone <br />Page 1 <br />Project: 2021.03.15_CC_Facilities_ <br />Date: Tue 9/28/21 <br />ATTACHMENT 1 <br />ATTY/AGR.2021.257/Wood Rodgers, Inc. (Bradford Storm Drain Pump Station Design) (Page 39 of 40)
The URL can be used to link to this page
Your browser does not support the video tag.