Laserfiche WebLink
7B <br /> Page 6 <br /> compliance threshold as indicated for the project checklist submitted and <br /> included in approved buifding permit plans. <br /> N. "Threshold Verification by LEED AP" means verification by a LEED <br /> accredited professional certifying tha# each LEED checklist point listed <br /> was verified to meet the requirements to achieve that point. The LEED AP <br /> shall provide supporting information from qualified professionals (e.g. civil <br /> engineer, electrical engineer, Title 24 consultant, commissioning agent, <br /> etc.) to certify compliance with each point on the checklist. <br /> Documentation of construction consistent with building plans calculated to <br /> achieve energy compliance is sufficient verification in lieu of post- <br /> construction commissioning. <br /> SECTION 9.182. STANDARDS FQR GREEN BUILDING C4MPLIANCE FOR <br /> RESIDENTIAL PROJECTS. Approval of any building permit for new <br /> construction or an addition of 1,0�0 square feet or more for a residentia! project <br /> shall not be granted unless the applicant submits a checklist demonstrating that <br /> the project receives: <br /> A. New Single-Family and Two-Family Residential: Single-Family <br /> GreenPoint, the minimum GreenPoint as published by Buildlt Green or <br /> higher, or LEED-H checklist required. <br /> B. Additions to Single-Family and Two-Family Residential: Existing Home <br /> GreenPoint, the minimum GreenPoint as published by Buildlt Green or <br /> higher, checklist required. <br /> C. New or additions to multi-family projects: GreenPoint or LEED- NC or <br /> LEED-H checklist required. <br /> SECTION 9.183. STANDARDS FOR GREEN BUILDtNG COMPLIANCE FOR <br /> NON-RESIDENTIAL PROJECTS. Approval of any building permit for non- <br /> residential construction of a new bui(ding(s), and additions of 1,000 sq ft or <br /> greater to an existing building, shall not be granted unless the applicant submits <br /> a LEED-NC checklist prepared by a LEED AP demonstrating that the project <br /> meets minimum level. <br /> SECTION 9.184. FINAL APPROVAL. Prior to fina! building inspection and <br /> occupancy for the above projects, a qualified building professional shall provide <br /> evidence of adequate green building compliance or documentation to the <br /> Building Official to satisfy the requirements of the Standards for Compliance for <br /> Residential and Non-Residential. This information shall include, but not limited <br /> to: <br /> F:AttylOrd/Ord.326 3 <br /> 100609 <br />