Laserfiche WebLink
SCHEDULE OF BID PRICES <br />All Bid items, including lump sums, unit prices and alternates (if any), must be filled in completely. Bid items <br />are described in Section 01 1100 (Summary of Work). Quote in figures only, unless words are specifically <br />requested. <br />ITEM <br />DESCRIPTION <br />EST. <br />UNIT <br />UNIT <br />TOTAL <br />TY. <br />PRICE <br />1. <br />Mobilization, Notification, Job Site <br />1 <br />LS <br />$ <br />$ <br />Management, Demobilization <br />4,900.0( <br />4,900.00 <br />Maximum 2.5% of total bid rice <br />2. <br />Traffic Control <br />Maximum 5.0% of total bid rice <br />1 <br />LS <br />$ <br />9,500.0c <br />$ <br />9,500.00 <br />3. <br />Construction Survey <br />1 <br />LS <br />900.00 <br />$ 4,900.00 <br />' <br />Maximum 2.5% of total bid rice <br />4. <br />Remove Striping and Pavement <br />1 <br />LS <br />$ <br />$ <br />Markings <br />1, 500.00 <br />1,500.00 <br />5. <br />Striping (Thermoplastic) <br />80 <br />LF <br />$ <br />$ 400.00 <br />6. <br />Striping (Paint) <br />1,000 <br />LF <br />$ <br />3.00 <br />$ <br />3,000.00 <br />7. <br />Striping -Filler Inside Curb Extensions <br />3,400 <br />SF <br />$ 8.00 <br />$ 27,200.00 <br />and Traffic Circles Paint <br />8. <br />Striping- Bike Boulevard Symbol <br />8 <br />EA <br />$ <br />$ <br />500.00 <br />41000.00 <br />9. <br />Striping- BikeSharrowSymbol <br />24 <br />EA <br />$ 100.00 <br />$ 2,400.00 <br />10. <br />Remove Sign (and Retain Post) <br />2 <br />EA <br />$ <br />$ <br />11. <br />Install Sign (on Existing Post) <br />9 <br />EA <br />$ <br />275.00 <br />$ <br />2,475.00 <br />12. <br />Install Sign and Post (Surface- <br />29 <br />EA <br />$ 350.00 <br />$ 10,150.00 <br />Mounted <br />13. <br />Install Sign and Post (Concrete- <br />31 <br />EA <br />$ <br />$ <br />Driven) <br />350.00 <br />10, 850.00 <br />14. <br />Relocate Sign and Post <br />1 <br />EA <br />$ 250.00 <br />$ 250.00 <br />15. <br />Install K71 Bollards <br />39 <br />EA <br />$300.00 <br />$ 11, 700.00 <br />16. <br />Install Traffic Circle Modular Rubber <br />125 <br />EA <br />$ <br />$ <br />Curbs <br />220.00 <br />27, 500.00 <br />17. <br />Install Modular Rubber Speed <br />4 <br />EA <br />$ <br />$ <br />Cushions- Set of 3 (West Segment of <br />6, 000 . 00 <br />24, 000.00 <br />Project and Kinq Street <br />18. <br />Install Modular Rubber Speed <br />6 <br />EA <br />$ <br />$ <br />Cushions -Set of 4 (East Segment of <br />8,500.0 <br />51,000.00 <br />Project <br />19. <br />Install Bus Lane Curbs -Center Piece <br />7 <br />EA <br />$ <br />$ <br />20. <br />install Bus Lane Curbs -End Piece <br />2 <br />EA <br />$ 100.0 <br />$ 200.00 <br />GRAND TOTAL FOR BASE BID ITEM NO. 1 TO NO. 20 <br />$197,273.00 <br />VERA AVENUE BICYCLE BOULEVARD PROJECT <br />BID FORM <br />004113-2 <br />