Laserfiche WebLink
REV: 10-11-2021 MI <br />zones in DDC engineering riser. <br />e. Applicable Use Taxes are included. <br />f. First year parts and labor warranty is included. <br />III. Clarifications <br />a. Payment & Performance Bond as customarily provided for projects is not <br />included <br />b. Certified payroll report will be provided as required. <br />c. Based on reuse of existing conduit and low voltage wire. End devices will <br />be replaced on compatibility with Trane I/O. <br />d. All new control wiring will be run in plenum where not exposed <br />or accessible. Where conduit is required, EMT and Rigid <br />conduit piping will be provided as per local union electrical <br />codes, and corrosive environments. <br />e. All required conduit shall be EMT or Rigid as specified per site building. <br />f.Agreement is based on utilizing union prevailing wage labor. <br />g. Agreement based on straight time labor hours Monday – Friday (7:00am - <br />3:30pm). <br />h. Building Management System shall integrate to the <br />following systems by enabling and disabling through BAS <br />applications and feedback alarm status to the BAS. <br />i. End devices and sensors are assumed to be operational. Repair will be <br />identified and quoted as change to contract. <br />Exclusions: <br />a.Repair to any failed end devices or communication link. Issues will be <br />identified and quoted as change to contract. <br />b.Low voltage wiring pertaining to systems not identified in this Agreement. <br />c.Air or water balance <br />d.Replacement or repair of Fan Powered VAV controllers. Integration ONLY <br />e.Replacement or repair of leak detectors. Integration ONLY <br />f.Furnish or install VFD’s, fan starters, equipment, power meters or smoke <br />detectors <br />g.Repair to any existing mechanical equipment linkages, VFD <br />drives, starters, pumps or valves unless specifically stated <br />above. <br />h.Furnish, install, wire or terminate duct-mounted smoke <br />detectors, shutdown interlocks, or combination smoke/fire <br />dampers. <br />i.Furnish, install, wire or terminate any panels/devices related <br />any systems not explicitly called out above, including (but not <br />limited to): smoke control systems, fire-life safety systems, <br />lighting control systems, power and/or energy monitoring, <br />security, tenant billing systems, etc. <br />j.Furnish any labor related to LEED certification. <br />k.Cutting. Patching, painting. <br />l.Permit and/or plan check fees. (Not Applicable) <br />m.Trenching or backfilling, or any underground conduit. <br />n.Asbestos or Hazardous Material Abatement. <br />o.Demolition of any kind. <br />p.Liquidated or consequential damages of any kind. <br />q.OCIP/CCIP insurance program credit. <br />r.Testing of fire life safety system <br />ATTY/AGR.2021.259/Pacific Coast Sales & Service, Inc. dba Pacific Coast Trane Service (Page 12 of 13)