My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt21 Crown Castle Fiber
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2021
>
Under $100K
>
Agmt21 Crown Castle Fiber
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2022 11:53:03 AM
Creation date
1/5/2022 11:52:44 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Crown Castel Fiber
PROJECT NAME
Wireless Master License Agreement
RMP File Number
304.5
Date
11/24/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 10-26-2021 SK <br />engineering standards; provided, however, that Licensee shall not <br />be responsible for any third-party or City costs necessary to correct <br />third party or City attachments that are non-compliant at the time of <br />Licensee’s Application. <br />5.7.(ii)Notification of Completion of Installation. Within twenty <br />(20) business days of completing the installation of Equipment on each <br />Municipal Facility, Licensee shall notify City of such completion. <br />5.8.Replacement of Municipal Facilities. <br />5.8.(i) Replacement Facility Approval. <br />Before installation, Licensee shall obtain prior written <br />approval from the City of any Replacement Facility. <br />5.8.(ii) Ownership of Replacement Facilities. <br />City shall own any approved Replacement Facility. Where <br />needed, Licensee shall cooperate with City to transfer <br />ownership and any associated warranties of any Replacement <br />Facility from Licensee to City without charge to City. <br />5.8.(iii)Replacement Facility Installation. <br />If Licensee is performing Make Ready Work, Licensee shall <br />be responsible for providing and installing any approved <br />Replacement Facility. <br />5.9.Damage, Maintenance, and Repair. <br />5.9.(i) Licensee shall, at its sole cost and expense and to the <br />satisfaction of the City: (a) remove, repair, or replace any of its Equipment <br />that is damaged or becomes detached; and/or (b) repair any damage to <br />Public Rights-of-Way, Municipal Facilities, or other property, whether <br />public or private, caused by Licensee, its agents, employees, or contractors <br />in their actions relating to attachment, operation, repair, or maintenance of <br />Equipment. Licensee shall complete such removal, repair, or replacement <br />within thirty (30) days’ of written notice. <br />5.9.(ii) City shall maintain and keep the Municipal Facilities authorized to <br />be used by Licensee pursuant to any Site License Agreement (other than <br />any Replacement Facilities) in good condition in accordance with City’s <br />standard maintenance requirements. Such maintenance of Municipal <br />Facilities shall be at City’s sole cost and expense, except to the extent this <br />Agreement provides otherwise. In the event that a Replacement Facility <br />needs to be cleared from the Public Rights-of-Way, City shall conduct this <br />work. In the event a Replacement Facility needs to be replaced or repaired <br />during the SLA Term applicable to the Replacement Facility, Licensee shall <br />conduct this work at Licensee’s own expense. In this case, Licensee will <br />ATTY/AGR.2021.268/Crown Castle (Page 10 of 28)
The URL can be used to link to this page
Your browser does not support the video tag.