My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt21 Crown Castle Fiber
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2021
>
Under $100K
>
Agmt21 Crown Castle Fiber
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2022 11:53:03 AM
Creation date
1/5/2022 11:52:44 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Crown Castel Fiber
PROJECT NAME
Wireless Master License Agreement
RMP File Number
304.5
Date
11/24/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 10-26-2021 SK <br />is likely to interfere with, Licensee’s Equipment. In the performance and exercise <br />of its rights and obligations under this MLA, Licensee must not interfere in any <br />manner with the existence and operation of any existing (as of the Installation Date) <br />public or private rights-of-way, sanitary sewers, water mains, storm drains, gas <br />mains, poles, aerial and underground electrical and telephone wires, electroliers, <br />cable television and telecommunications facilities, utilities, existing and future <br />licensed municipal communication frequencies, or existing and future Municipal <br />Facilities, without the express approval of the owner or owners of the affected <br />property or properties, except as authorized by applicable Laws or this MLA. If <br />such interference should occur, Licensee shall discontinue using the Equipment, <br />methodology or technology that causes the interference until Licensee takes <br />corrective measures to eliminate such interference. In the event that such <br />interference does not cease promptly, the Parties acknowledges that continuing <br />interference may cause irreparable injury and harm, and therefore, in addition to <br />any other remedies, and without limitation of any other remedy, the non-interfering <br />party shall be entitled to seek temporary and permanent injunctions against the <br />breach of this Subsection. <br />3.4.Disconnect Switch. Licensee shall install a disconnect device at <br />each Municipal Facility on which it installs Equipment pursuant to an SLA so that <br />in case of emergency or if Licensee abandons its Equipment as determined by City, <br />the City may disconnect such Equipment from its power source and safely shut it <br />down. <br />3.5.Compliance with Laws. Licensee will comply with all applicable <br />Laws, including regulations and PUC General Orders, in the exercise of its rights <br />and the performance of its obligations under this MLA. <br />3.6.No Authorization to Install Unauthorized Equipment or <br />Provide Other Services. Licensee represents that its Equipment installed pursuant <br />to this MLA will be used solely for the purpose of providing the Services, and <br />Licensee will not install unauthorized Equipment for any purpose or use its <br />authorized Equipment to offer or provide any other services. Licensee’s failure to <br />comply with these limitations will constitute a material breach of this MLA. If City <br />discovers any Equipment has been installed on Municipal Facilities without <br />authorization pursuant to an SLA, City may send an invoice to Licensee for a sum <br />equal to five (5) times the then-current Annual Fee as compensation for the <br />unauthorized attachments, and, within sixty (60) days from the date of such invoice, <br />Licensee shall (i) pay the invoiced amount to City and submit an Application for <br />the unauthorized Equipment, or (ii) produce documentation showing City’s prior <br />approval of the Equipment identified in the invoice. If, in accordance with this <br />Section, Licensee fails to pay all fees and submit the Application or submit <br />documentation satisfactorily showing City’s prior approval within sixty (60) days <br />of City’s invoice, City may remove the unauthorized Equipment at Licensee’s <br />expense. If City removes such unauthorized Equipment, such Equipment shall <br />become the property of City, who shall have sole rights over such Equipment’s <br />disposition. City’s removal of unauthorized Equipment shall not release Licensee <br />from its obligation to pay those invoiced fees accruing pursuant to this Section. <br />ATTY/AGR.2021.268/Crown Castle (Page 5 of 28)
The URL can be used to link to this page
Your browser does not support the video tag.