My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
RecDoc2021-156651 Subdivision Improvement Agreement-1390 Woodside
RedwoodCity
>
City Clerk
>
Recorded Docs CC&Rs
>
Recorded Docs 2013-2020 Additional sub folders
>
Recorded Documents 2013-2023 (additional sub folders)
>
Agreements
>
2019-2022
>
RecDoc2021-156651 Subdivision Improvement Agreement-1390 Woodside
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2022 11:47:15 AM
Creation date
1/6/2022 11:18:02 AM
Metadata
Fields
Template:
Recorded Docs
Recorded Docs - Type
Agreement
Subject
Subdivision Agreement
Doc Num
2021-156651
Rec Date
11/9/2021
Address
1390 Woodside Road
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.11. all other work, improvements, or construction required by or specified <br />in the abovementioned plans and specifications, conditions of permits <br />and all construction, appurtenances and improvements necessary as <br />reasonably determined by the City Engineer to complete the <br />aforementioned improvements, both within and outside of the Property. <br />The construction, installation and completion of the Improvements and all labor and <br />materials furnished in connection therewith are hereinafter referred to collectively as the <br />"Work." The Work and Improvements will be in strict compliance with the provisions of <br />Chapter 30 of the Redwood City Code. In the event a conflict exists between the <br />Improvement Plans and the requirements of Chapter 30 of the Redwood City Code, the <br />stricter requirement or standard will govern, as determined by the City Engineer. <br />4. Completion Date. Developer will complete the Work within one year of the <br />Effective Date. All Work will be completed in a good and workmanlike manner in <br />accordance with accepted design and construction practices and consistent with the <br />Improvement Plans. This completion date may be extended by the City Engineer in their <br />sole and absolute discretion at the request of Developer, which request will be <br />accompanied by a written assurance acceptable to the City Engineer that the securities <br />required by Section 13 (Performance, Labor and Materials and Warranty Security) will <br />remain enforceable throughout the term of the extension. <br />5. Estimated Cost of Work. The engineer's estimated cost of the Work is One <br />Hundred Forty Thousand Seventy -One and No/100 Dollars ($140,071.00) ("Estimated <br />Cost of Work"). <br />6. Modifications to the Plans. Approval of this Agreement by City does not <br />release Developer from its responsibility to correct mistakes, errors or omissions in the <br />Improvement Plans. If, at any time, in the opinion of the City Engineer, in their reasonable <br />discretion, the Improvement Plans are deemed inadequate in any respect, Developer <br />agrees to make such modifications, changes or revisions as necessary in order to <br />complete the Work in a good and workmanlike manner in accordance with accepted <br />design and construction standards and consistent with the Conditions and Improvement <br />Plans. <br />7. Repairs. Developer will either (a) repair or have repaired in a timely manner <br />at its sole cost and expense all public roads, streets, or other public or private property <br />damaged as a result of or incidental to the Work or in connection with the development <br />of the Property, or (b) pay to the property owner of any damaged road, street or property <br />the full cost of such repair. In addition, Developer will obtain the written acceptance of <br />such repair or payment from any owner whose private or public property was repaired by <br />Developer or to whom Developer has paid the full cost of such repair in accordance with <br />this Section 7. City will be under no obligation whatsoever to accept the Work completed <br />under this Agreement until such time as all repairs have been completed or have been <br />paid for and written acceptances have been provided to the City Engineer. <br />X:\D_E\DATA\Deve1opment\1390 Woodside Road\SUBDIVISION IMPROVEMENT AGREEMENT 527.2021 (final).docx <br />Initial: AW <br />Page 3 of 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.