Laserfiche WebLink
completed or have been paid for and written acceptances have been provided to the City <br />Engineer. <br />17. SCOA's Improvement Security. In addition to the performance and labor and <br />material securities to be provided by the General Contractor (the terms and costs of which are <br />addressed in Sections 10 and 12 above), SCOA will furnish and deliver to City within the times <br />set forth in the Schedule of Performance the following security instruments, each of which must <br />be issued by a surety company duly and regularly authorized to do general surety business in the <br />State of California, or such other surety as may be acceptable to the City Engineer: <br />(a) Performance Security. Prior to commencement of construction of the Levee <br />Improvements or any work of deconstruction of the existing Seaport Centre Levee, SCOA shall <br />furnish and deliver performance security in the amount of one hundred percent (100%) of the <br />Final Design and Construction Budget, which security must meet the requirements of <br />Government Code section 66499.1 and Redwood City Code section 30.80 and be acceptable to <br />the City Engineer. The security shall be conditioned upon the faithful performance of this <br />Agreement with respect to the Levee Improvements work and shall be released by City as <br />provided in this Section 17 below upon City's final acceptance of the Levee Improvements as <br />described in Section 15 above and SCOA's delivery of the Warranty Security described in <br />Subsection 17(c) below. <br />(b) Payment Securitx. Prior to commencement of construction of the Levee <br />Improvements or any work of deconstruction of the existing Seaport Centre Levee, SCOA shall <br />furnish and deliver labor and materials security in the amount one hundred percent (100%) of the <br />Final Design and Construction Budget, which security must meet the requirements of <br />Government Code section 66499.2 and Redwood City Code Section 30.80 and be acceptable to <br />the City Engineer. The security shall secure payment to the contractor(s) and subcontractor(s) <br />performing the Levee Improvements work and to all persons furnishing labor, materials or <br />equipment to them. City shall retain the security until such time as (i) City has accepted the <br />Levee Improvements in accordance with Section 15 above, and (ii) the statute of limitations to <br />file an action under Civil Code section 8410 et seq. has expired. The security amount may <br />thereafter be reduced or released by the City Engineer in accordance with this Section 17. <br />(c) Warranty_ Security. SCOA shall furnish and deliver warranty security in the <br />amount of ten percent (10%) of the Final Design and Construction Budget, prior to City's <br />acceptance of the Levee Improvements and prior to release of the Performance security. The <br />warranty security shall be in a form reasonably acceptable to the City Engineer and shall <br />guarantee faithful performance of SCOA's warranty obligations, including repair and <br />replacement obligations described in Section 22 below, from the date on which the City accepts <br />the Levee Improvements as complete until expiration of the Warranty Period. SCOA's Warranty <br />Period obligations will not, however, be limited to the amount of warranty security. <br />(d) Costs of Securit . The costs of the performance, payment and warranty security <br />shall be included in the Final Design and Construction Budget and the Final Project Costs <br />(e) Filing and Replacement of Surety Bonds. Improvement security consisting of <br />corporate surety bonds shall be kept on file with the City Engineer. If the improvement security <br />OAK #4819-4834-1908 v20 22 <br />