My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
RecDoc2022-South Main Block F
RedwoodCity
>
City Clerk
>
Recorded Docs CC&Rs
>
Recorded Docs 2013-2020 Additional sub folders
>
Recorded Documents 2013-2023 (additional sub folders)
>
Agreements
>
2019-2022
>
RecDoc2022-South Main Block F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2022 4:19:34 PM
Creation date
2/11/2022 4:18:43 PM
Metadata
Fields
Template:
Recorded Docs
Recorded Docs - Type
Agreement
Subject
Subdivision Improvement Agreement
Doc Num
2022-004141
Rec Date
1/18/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
21.1 City may proceed to complete the Work by contract or other method <br />City considers advisable, at the sole expense of Developer. Developer, <br />immediately upon demand, will pay the costs and charges related to the Work and <br />any subsequent repairs. City, without liability for doing so, may take possession <br />of and utilize in completing the Work and repairs, if any, such materials and other <br />property belonging to Developer as may be on or about the Property and <br />necessary for completion of the work. In the event of default, the financial <br />institution holding the securities will be liable to City to pay the face amount of the <br />security, as specified under Section 12 (Performance, Labor and Materials and <br />Warranty Security). <br />21.2 City may bring legal action to compel performance of this Agreement <br />and recover the costs of completing the Work and/or repairs, if any, including City's <br />administrative and legal costs or pursue any other action at law or equity. <br />21.3 Developer agrees that if legal action is brought by City under this <br />section of the Agreement, Developer will pay all of the costs of suit, reasonable <br />attorney fees, and such other costs as may be determined by the court. <br />21.4 No failure on the part of City to exercise any right or remedy <br />hereunder will operate as a waiver of any other right or remedy that City may have <br />hereunder. <br />21.5 The rights and remedies of City are cumulative, and the exercise by <br />City of one or more of such rights or remedies will not preclude the exercise by it, <br />at the same or different times, of any other rights or remedies for the same default <br />or any other default. <br />22. f=inal Drawings. Upon completion of the Work and prior to final acceptance, <br />Developer will deliver to City a set of "as -built" drawings consistent with the Conditions. <br />These drawings will be in a form acceptable to the City Engineer, will be certified as being <br />"as -built" and will reflect the Work as actually constructed, with any and all changes <br />incorporated therein. Said drawings will be signed and sealed as accurate by the <br />engineer of record. <br />23. Monuments. All pipes and monuments shown on the Final Map which are <br />destroyed or displaced during construction operations will be replaced by Developer at <br />the time of the final inspection of the Improvements, if any. <br />24. Notices. Any notices relating to this Agreement will be given in writing and <br />will be deemed sufficiently given and served for all purposes when delivered personally <br />or by generally recognized overnight courier service, or five (5) days after deposit in the <br />United States mail, certified or registered, return receipt requested, with postage prepaid, <br />addressed as follows: <br />REV: 08-30-21 SK <br />ATTY/AGR.2021.230/South Main (Block F - SIA) (Page 12 of 23) <br />
The URL can be used to link to this page
Your browser does not support the video tag.