My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt22 Sandis
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2022
>
Under $ 100K
>
Agmt22 Sandis
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2022 12:22:00 PM
Creation date
3/2/2022 12:21:51 PM
Metadata
Fields
Template:
Agreement
Contractor Name
SANDIS Civil Engineers Surveyors Planners
PROJECT NAME
Consulting firm to provide land surveying
RMP File Number
304.5
Date
2/18/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 02-07-2022 JB <br />iii.Survey stationing 1+00 shall start at centerline of street intersection or <br />centerline of manholes unless otherwise noted. Please see attached <br />location map with notations of recommended starting point of Station. <br />iv.Redwood City Datum shall be used in preparing the topographic survey. <br />The City will provide the location of the nearest benchmark if required. <br />Benchmark information used shall be noted on the topographic survey. <br />North American Vertical Datum of 1988 (NAVD88) shall be used. All data <br />on other vertical datum’s shall be converted to NAVD88. Please refer to <br />City’s Attachment J –Comparison of Datum on EXHIBIT “D” of the RFP. <br />The North American Datum of 1983 (NAD83) shall be used as horizontal <br />and geometric control datum. <br />v.The Consultant shall request the As-Built/Record Drawings from utility <br />companies (e.g. Comcast, PG&E, AT&T, Pacific Bell, SVCW, MCI, <br />SFPUC, Calwater, RCN, SVCW, etc.) to the selected consultant for <br />inclusion in the survey base map. The City will provide an endorsement <br />letter stating that the Consultant is requesting the information on behalf <br />of the City. <br />vi.The City will provide a sample of an approved topographic survey <br />drawing to be used as reference to conform to City requirements. <br />vii.The City will provide block book drawings to be used as reference in <br />conjunction with the surveyed features stated above to determine <br />alignment of underground utilities. The size and materials of the utilities <br />from the block book drawings shall be checked against the field <br />measurements. Sizes and materials of the utilities shall be shown on the <br />base map. <br />d.Project's Close-Out Meeting with the City. <br />i.Consultant shall meet with the City and prepare an agenda to discuss, <br />clarify and confirm the project's deliverables. <br /> Deliverables of the base map include but not limited to: <br />•City approved Civil 3D drawing files (including all point files) of the <br />Project. <br />•Record drawings requested from utility companies in PDF format. <br />2.The Consultant shall perform Boundary Survey, as requested, for the City by <br />researching record maps on file with the County of San Mateo, City right-of-way <br />and title records, and applicable deeds under the supervision of a Licensed <br />Land Surveyor. The Consultant shall locate all controlling monuments shown <br />and reference in public records. The Consultant shall also tie the controlling <br />monuments to the project boundaries. <br />ATTY/AGR.2022.032/Sandis Civil Engineers, Surveyors, and Planners (Page 13 of 16)
The URL can be used to link to this page
Your browser does not support the video tag.