My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt22 Onpoint Construction
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2022
>
Agmt22 Onpoint Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2022 4:14:33 PM
Creation date
3/14/2022 4:10:34 PM
Metadata
Fields
Template:
Agreement
Contractor Name
OnPoint Construction
PROJECT NAME
Supply of Construction Services for FOCC remodel project
RMP File Number
304
Date
3/8/2022
MO Ref
22-020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Construction Services Agreement <br />REV: 04-26-2021 PR <br />00 5205 - 12 <br /> <br /> <br /> <br />2.11 Construction Performance Bond; Construction Labor and Materials Payment Bond; <br />Securities in Lieu of Retention Escrow Account. <br />A. If Contract Sum under the Agreement exceeds (or is expected to exceed) $25,000, Contractor shall <br />provide a construction performance bond in form attached hereto as Appendix D – Construction <br />Performance Bond, and a construction labor and material payment bond, in accordance with Civil <br />Code Section 9550 and in form attached hereto Appendix E – Construction Labor and Materials <br />Payment Bond. Contractor may not substitute cash in lieu of the required bond(s). <br />B. If the Agreement specifies performance retention, Contractor may elect to substitute securities or <br />direct payment to an escrow account, pursuant to Public Contract Code Section 22300 <br />(incorporated herein by this reference). <br />2.12 Earthwork and Underground Facilities. If the Work involves digging trenches or other <br />excavations that extend deeper than four feet below the surface, Contractor shall notify City in <br />writing of any material that Contractor believes may be hazardous waste that is required to be <br />removed in accordance law, subsurface or latent physical conditions at the site differing from those <br />indicated by information about the site made available to bidders prior to the deadline for submitting <br />bids, or unknown physical conditions at the site of any unusual nature, different materially from <br />those ordinarily encountered and generally recognized as inherent in work of the character <br />provided for in the Contract Documents, pursuant to Section 7104 of the Public Contract Code. <br />For any Work involving trench shoring that costs in excess of $25,000, Contractor shall submit and <br />City (or a registered civil or structural engineer employed by City) must accept, in advance of <br />excavation, a detailed plan showing the design of shoring, bracing, sloping, or other provisions to <br />be made for worker protection from the hazard of caving ground during the excavation of such <br />trench or trenches, pursuant to Labor Code Section 6705. If such plan varies from the shoring <br />system standards, the plan shall be prepared by a registered civil or structural engineer. <br />Consistent with Government Code Section 4215, as between City and Contractor, City will be <br />responsible for the timely removal, relocation, or protection of existing main or trunk line utility <br />facilities located on the Site only if such utilities are not identified in the Contract Documents <br />or information made available for bidding.
The URL can be used to link to this page
Your browser does not support the video tag.