My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt22 Onpoint Construction
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2022
>
Agmt22 Onpoint Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2022 4:14:33 PM
Creation date
3/14/2022 4:10:34 PM
Metadata
Fields
Template:
Agreement
Contractor Name
OnPoint Construction
PROJECT NAME
Supply of Construction Services for FOCC remodel project
RMP File Number
304
Date
3/8/2022
MO Ref
22-020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Construction Services Agreement <br />REV: 04-26-2021 PR <br />00 5205 - 2 <br /> <br /> <br /> <br /> <br />B. The Contract Sum is to be paid as (check one): (1) lump sum; (2) lump sum with progress <br />payments; (3) per attached schedule of rates and charges. All payments (check one): shall <br /> shall not be subject to a five percent (5%) retention. <br />See Scope of Work attached as Appendix A. <br /> <br />ARTICLE 2 COMMENCEMENT AND COMPLETION OF WORK <br /> <br />2.01 Commencement of Work <br />A. Contractor shall commence Work on the date established in the Notice to Proceed (Commencement <br />Date). <br />B. City reserves the right to modify or alter the Commencement Date. <br />2.02 Completion of Work <br />A. Contractor shall achieve Substantial Completion of the entire Work within [90] Days from the <br />Commencement Date. <br />B. Contractor shall achieve Final Completion of the entire Work [120] Days from the Commencement <br />Date. <br />ARTICLE 3 PROJECT REPRESENTATIVES <br />3.01 City’s Project Manager <br />A. In the pre-construction conference, referenced in item No. 5, Document 00 5105 (Notice of Award), the <br />City will designate the Public Works Facilities Superintendent as its Project Manager to act as City’s <br />Representative in all matters relating to the Contract Documents. If Project Manager is an employee of <br />City, Project Manager is the beneficiary of all Contractor obligations to City including, without limitation, <br />all releases and indemnities. <br />B. Project Manager shall have final authority over all matters pertaining to the Contract Documents and <br />shall have sole authority to modify the Contract Documents on behalf of City, to accept work, and to <br />make decisions or actions binding on City, and shall have sole signature authority on behalf of City. <br />C. City may assign all or part of the Project Manager’s rights, responsibilities and duties to a Construction <br />Manager, or other City Representative. <br />3.02 Contractor’s Project Manager and Other Key Personnel <br />A. Contractor has designated Manolis Koutantos as its Project Manager to act as Contractor’s <br />Representative in all matters relating to the Contract Documents. <br />B. Contractor has designated the following other Key Personnel for the Project: <br />Name Position <br /> <br />Bruce Dockter Partner <br /> <br /> <br /> <br /> <br /> <br />ARTICLE 4 LIQUIDATED DAMAGES FOR DELAY IN COMPLETION OF WORK <br />4.01 Liquidated Damage Amounts
The URL can be used to link to this page
Your browser does not support the video tag.