My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt21 Ross McDonald, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2021
>
Agmt21 Ross McDonald, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2022 11:41:58 AM
Creation date
4/26/2022 11:40:44 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Ross McDonald, Inc.
PROJECT NAME
Purchase Agreement
RMP File Number
304
Date
2/10/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BKS (21) 57 47 36 67 <br />Ross McDonald Company, Inc <br />COMMERCIAL GENERAL LIABILITY <br />CG 88 70 12 08 <br />THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. <br />CONSTRUCTION PROJECT(S) - GENERAL AGGREGATE LIMIT <br />(PER PROJECT) <br />This endorsement modifies insurance provided under the following: <br />COMMERCIAL GENERAL LIABILITY COVERAGE PART <br />A. For all sums which the insured becomes legally obligated to pay as damages caused by `occurrences" <br />under Section I — Coverage A - Bodily Injury And Property Damage Liability, and for all medical <br />expenses caused by accidents under Section I — Coverage C Medical Payments, which can be <br />attributed only to ongoing operations at a single construction project away from premises owned by or <br />rented to you: <br />1. A separate Construction Project General Aggregate Limit applies to each construction project, <br />and that limit is equal to the amount of the General Aggregate Limit shown in the Declarations. <br />2. The Construction Project General Aggregate Limit is the most we will pay for the sum of all <br />damages under Coverage A, except damages because of "bodily injury" or "property damage" <br />included in the 'prod ucts-completed operations hazard", and for medical expenses under <br />Coverage C regardless of the number of: <br />a. Insureds; <br />b. Claims made or "suits" brought; or <br />C. Persons or organizations making claims or bringing "suits". <br />3. Any payments made under Coverage A for damages or under Coverage C for medical expenses shall <br />reduce the Construction Project General Aggregate Limit for that construction project. Such payments <br />shall not reduce the General Aggregate Limit shown in the Declarations nor shall they reduce any other <br />Construction Project General Aggregate Limit for any other construction project. <br />4. The limits shown in the Declarations for Each Occurrence, Fire Damage and Medical Expense continue <br />to apply. However, instead of being subject to the General Aggregate Limit shown in the Declarations, <br />such limits will be subject to the applicable Construction Project General Aggregate Limit. <br />B. For all sums which the insured becomes legally obligated to pay as damages caused by 'occurrences" <br />under Section I — Coverage A - Bodily Injury And Property Damage Liability, and for all medical <br />expenses caused by accidents under Section I — Coverage C Medical Payments, which cannot be <br />attributed only to ongoing operations at a single construction project away from premises owned by or <br />rented to you: <br />1. Any payments made under Coverage A for damages or under Coverage C for medical expenses <br />shall reduce the amount available under the General Aggregate Limit or the Products -Completed <br />Operations Aggregate Limit, whichever is applicable; and <br />2. Such payments shall not reduce any Construction Project General Aggregate Limit. <br />C. When coverage for liability arising out of the "products -completed operations hazard" is provided, any <br />payments for damages because of "bodily injury" or "properly damage" included in the "products - <br />completed operations hazard" will reduce the Products -Completed Operations Aggregate Limit, and not <br />reduce the General Aggregate Limit nor the Construction Project General Aggregate Limit. <br />D. If the applicable construction project has been abandoned, delayed, or abandoned and then restarted, or <br />if the authorized contracting parties deviate from plans, blueprints, designs, specifications or timetables, <br />the project will still be deemed to be the same construction project. <br />E. The provisions of Section III - Limits Of Insurance not otherwise modified by this endorsement shall <br />continue to apply. <br />CG 88 70 12 08 Includes copyrighted material of ISO Properties, Inc., with its permission Page 1 of 1 <br />59846570 1 ROSSM-4 121/22 - Per Project I MaryAnn Worman 11/25/2021 4:11:49 PM (PST) I Page 20 of 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.