My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
RecDoc2022-044660 STMMA South Main Block C
RedwoodCity
>
City Clerk
>
Recorded Docs CC&Rs
>
Recorded Docs 2013-2020 Additional sub folders
>
Recorded Documents 2013-2023 (additional sub folders)
>
Agreements
>
2019-2022
>
RecDoc2022-044660 STMMA South Main Block C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2022 9:13:35 AM
Creation date
6/24/2022 9:12:31 AM
Metadata
Fields
Template:
Recorded Docs
Recorded Docs - Type
Agreement
Subject
Stormwater Treatment Measures Agreement
Doc Num
2022-044660
Rec Date
6/1/2022
Address
South Main- Block C
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT C <br />Parcel 'C' <br />1601 EI Camino Real <br />Flow -Through Planter C-2 <br />Biotreatment <br />Along Cedar Street <br />Flow -Through Planter C-3 <br />Biotreatment <br />Along Cedar Street <br />Flow -Through Planter B-5 <br />Biotreatment <br />Along Beech Street <br />Flow -Through Planter B-6 <br />Biotreatment <br />Along Beech Street <br />Silva Cell Treatment M-4 <br />Silva cell treatment <br />Along Main Street <br />V. Summary of Inspections and Maintenance: <br />Use the attached Treatment Area Inspection and Maintenance Checklist to conduct inspections <br />monthly (or as needed), identify needed maintenance, and record maintenance that is <br />conducted. <br />VI. Sediment Removal: <br />Total amount of accumulated sediment removed from the storm water treatment measure(s) <br />during the reporting period: cubic yards. <br />How was sediment disposed? <br />❑ landfill <br />❑ other location on-site as described in and allowed by the maintenance plan <br />❑ other, explain: <br />VII. Inspector Information: <br />The inspections documented in the attached Inspection and Maintenance Checklists were <br />conducted by the following inspector(s): <br />Inspector Name and Title <br />VIII. Certification: <br />Inspector's Employer and Address <br />I hereby certify, under penalty of perjury, that the information presented in this report and <br />attachments is true and complete: <br />Signature of Property Owner or Other Responsible Party Date <br />Type or Print Name <br />Page 2 <br />ATTY/AGR 2022.073/STMMA (Page 16 of 21) <br />0&M Inspection Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.