Laserfiche WebLink
SDCO OVERFLOW DRAIN TOP OF <br />F SILVA CELLS <br />SILVA CELL <br />NOTES <br />BOTTOM OF SILVA CELLS–/ <br />SILVA CELL UNIT <br />3.0' TYP <br />CITY STANDARD D8 <br />STORM DRAIN INLET <br />FILL LINE --� <br />OVERFLOW DRAIN 1 <br />(BEYOND) 42" <br />SILVA CELL <br />POST <br />12' DEPTH DRAIN ROCK <br />CALTRANS CLASS II <br />PERMEABLE PLACED ON <br />NATIVE SOIL @ 95% R.C. <br />(2) 2" DIA. HOLES IN BASE <br />J/ <br />TO ALLOW FOR EXFILTRATION <br />SILVA CELL SUBDRAIN IN GRAVEL <br />BASE FILL W/ CLEANOUT <br />SILVA CELL PERMEABLE GEO TEXTILE–/ <br />1.0' STORAGE LAYER <br />N.T.S. <br />DISTRIBUTION HEADER <br />W/ INLET PIPE <br />CONCRETE SIDEWALK <br />OVER AGG BASE, SCF <br />COVER <br />z <br />0 <br />0 <br />� o <br />Q <br />J_ <br />u <br />ATTY/AGR.2022 071/STMMA (Page 15 of 23) <br />SILVA CELL SYSTEM (DECK, BASE, AND <br />�'—J <br />STORM DRAIN CLEANOUT. CHRISTY TYPE <br />POSTS). <br />F08 BOX WITH F08R LID MARKED STORM <br />18" TREATMENT SOIL, INFILTRATION RATE <br />N <br />GEOGRID, ATTACH TO CELL FRAMES WITH <br />5 TO 10 IN/HR (FOR TREATMENT SOIL <br />CABLE TIES. <br />SPECIFICATION, SEE APPENDIX K IN <br />/1 <br />V <br />CABLE TIES, ATTACHING GEOGIRD TO <br />SMCWPPP C3 STORMWATER HANDBOOK <br />SILVA CELL LEG. <br />DATED JUNE 2016). <br />® <br />1"-4" (25 MM -100 MM) SPACING <br />12" DRAIN ROCK (CLASS II PERMEABLE <br />BETWEEN SILVA CELLS AT BASE. <br />�F <br />MATERIAL PER CALTRANS STANDARD <br />4" (100 MM) MIN AGGREGATE SUB CASE, <br />SPECIFICATIONS, SECTION 68-2.02F). <br />COMPACTED TO 957. RELATIVE <br />GEOTEXTILE (MIRAFI 140N OR APPROVED <br />COMPACTION. <br />G <br />EQUAL TO KEEP AGGREGATE FROM <br />) <br />GEOTEXTILE (MIRAFI 140N OR APPROVED <br />MIGRATING DOWN THROUGH CELL DECK. <br />EQUAL), TO PROVIDE SEPARATION <br />BETWEEN <br />11 <br />CLASS II AGGREGATE BASE COURSE, <br />SUBGRADE AND AGGREGATE <br />L/ <br />DEPTH VARIES ACROSS SECTION. <br />BASE. <br />/1 <br />V <br />PEDESTRIAN SIDEWALK, SEE LANDSCAPE <br />PLANS FOR LAYOUT & DETAILS. <br />SUBGRADE, COMPACTED TO 95% RELATIVE <br />COMPACTION. <br />a <br />6" PERFORATED DISTRIBUTION PIPE.� <br />PIN, PER SILVA CELL SPECIFICATIONS, TO <br />L/ <br />OU <br />KEEP CELLS IN PLACE DURING <br />CALTRANS CLASS 2 DRAIN ROCK. <br />CONSTRUCTION. <br />L <br />8" PERFORATED COLLECTOR PIPE. <br />OVERFLOW DRAIN. NDS IN—LINE GRATE <br />PLACED 6" MIN ABOVE BIO—MEDIA SOIL <br />E <br />MIX.. <br />a <br />EXHIBIT B5 <br />�a <br />TALUS <br />STORM WATER <br />MAINTENANCE AGREEMENT <br />`o <br />'—`�----`-- <br />ENOINEERING I PLANNING I DEVELOPMENT <br />SILVA CELL TREATMENT: M-5 <br />Job No.: 18190 <br />Date: 01/19/22 Sheet: 05 of 06 <br />ATTY/AGR.2022 071/STMMA (Page 15 of 23) <br />