My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
RecDoc-2022-044667 STMMA South Main Block E
RedwoodCity
>
City Clerk
>
Recorded Docs CC&Rs
>
Recorded Docs 2013-2020 Additional sub folders
>
Recorded Documents 2013-2023 (additional sub folders)
>
Agreements
>
2019-2022
>
RecDoc-2022-044667 STMMA South Main Block E
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2022 9:42:08 AM
Creation date
6/24/2022 9:40:31 AM
Metadata
Fields
Template:
Recorded Docs
Recorded Docs - Type
Agreement
Subject
STMMA South Main Block E
Doc Num
2022-044667
Rec Date
6/1/2022
Address
1601 El Camino Real
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT C <br />1601 EI Camino Real <br />Parcel 'E' <br />Storm Water Treatment Maintenance Plan <br />Project Address & Cross Streets: <br />1601 EI Camino Real Redwood City,CA 94063 <br />Located Between Main Street & Caltrain <br />Assessor's Parcel No.: <br />Property Owner: 1QHQ Elco Yards, LP <br />Phone No.: 818 497-4340 <br />Designated Contact: Ian Colburn <br />Mailing Address: 674 Via De La Valle, Suite 206 <br />Solana Beach. CA 9 <br />The property contains two (3) treatment devices and one (1) detention vault located as described below <br />and as shown in the attached site plan: <br />• Media Filter Vault BE -1 is located at the northeast corner of Building E (N). <br />• Media Filter Vault BE -2 is located at the southwest corner of Building E (N). <br />• Media Filter Vault BE -3 is located outside of Building E (S), along Main Street. <br />■ Flow -Through Planter BEA is located between Building E (S) and the Shed. <br />• Detention Pipe (BE -1) is located at the northeast corner of Building E (N). <br />■ Detention Pipe (BC -3) is located outside of Building E (S), along Main Street. <br />• Flow -Through Planter C-4 is located along Chestnut Street. <br />• Flow -Through Planter C-5 is located along Chestnut Street. <br />• Flow -Through Planter M-6 is located along Main Street. <br />• Flow -Through Planter M-7 is located along Main Street. <br />• Silva Cell Treatment area M-5 is located along Main Street. <br />Page 1 <br />ATTY/AGR.2022.071/STMMA (Page 20 of 23) <br />
The URL can be used to link to this page
Your browser does not support the video tag.