My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt22 Casey Construction, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2022
>
Agmt22 Casey Construction, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2022 11:54:52 AM
Creation date
6/24/2022 11:54:18 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Casey Construction, Inc.
PROJECT NAME
2021-2022 Watermain Replacement Project Brookline
Date
6/1/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SCHEDULE OF BID PRICES <br />All Bid items, including lump sums, unit prices and alternates (if any), must be filled in completely. <br />Bid items are described in Section 01 1100 (Summary of Work). Quote in figures only, unless <br />words are specifically requested. <br />Ite <br />M <br />Description <br />Estimated <br />Quantity <br />Unit <br />Total Item <br />Unit Price Cost <br />d <br />Mobilization, Demobilization, Traffic <br />Control, Construction Layout, <br />1. <br />Notification & incidentals (Maximum <br />1 <br />LS <br />$ 25,660.00 $25,660.00 <br />5% of the Total Base Bid, Items 1 <br />through 17) <br />Sheeting, shoring and bracing for all <br />2 <br />trenching and excavation work in <br />1 LS <br />$ 13,000.00 $ 13,000.00 <br />accordance with California Labor <br />Code Section 6707 <br />j <br />3 <br />Watermain Disinfection and <br />1 LS <br />$ 7,200.00 $ 7,200.00 <br />Commissioning <br />4. <br />6 -inch C900 PVC Watermain <br />44 <br />LF i $ 284.00 <br />$ 12,496.00 <br />5. <br />8 -inch C900 PVC Watermain <br />382 <br />LF <br />$ 260.00 <br />$ 99,320.00 <br />6. <br />10 -inch C906 HDPE Watermain <br />996 <br />LF <br />$ 220.00 <br />$ 219,120.00 <br />7. <br />10 -inch Gate Valve <br />2 <br />EA <br />$ 3,800.00 <br />$ 7,600.00 <br />8. <br />8 -inch Gate Valve <br />2 <br />EA <br />$ 2,500.00 <br />$ 5,000.00 <br />9 2" Water Service and Yard Piping <br />18 <br />EA <br />$ 3,500.00 <br />$ 63,000.00 <br />Connected to New HDPE Main <br />10. <br />2" Water Service and Yard Piping <br />4 <br />EA <br />$ 3,600.00 <br />$ 14,400.00 <br />Connected to New PVC Main <br />11 <br />2" Water Service and Yard Piping <br />6 <br />EA <br />$ 3,800.00 <br />$22,800.00 <br />Connected to Existing Watermain <br />12 <br />Fire Hydrant Replacement and <br />1 <br />EA <br />$ 14,000.00 <br />$ 14,000.00 <br />Connection to New PVC Watermain <br />Fire Hydrant Replacement and <br />13. <br />Connection to New HDPE <br />1 <br />EA <br />$ 14,300.00 <br />$ 14,300.00 <br />Watermain <br />14. <br />2" Combination Air Release Valve <br />1 <br />EA ' $ 6,700.00 --F$61700.00 <br />Assembly <br />BID FORM 004113-2 <br />2021-2622 Watermain Replacement Project- Brookline <br />
The URL can be used to link to this page
Your browser does not support the video tag.