Agmt22 Casey Construction, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2022
>
Agmt22 Casey Construction, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2022 11:54:52 AM
Creation date
6/24/2022 11:54:18 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Casey Construction, Inc.
PROJECT NAME
2021-2022 Watermain Replacement Project Brookline
Date
6/1/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ARTICLE 3 PROJECT REPRESENTATIVES <br />3.01 CITY'S PROJECT MANAGER <br />A. In the pre -construction conference, referenced in item No. 5, Document 00 5100 (Notice <br />of Award), the City will designate as its Project Manager to act as City's Representative in <br />all matters relating to the Contract Documents. If Project Manager is an employee of City, <br />Project Manager is the beneficiary of all Contractor obligations to City including, without <br />limitation, all releases and indemnities. <br />B. Project Manager shall have final authority over all matters pertaining to the Contract <br />Documents and shall have sole authority to modify the Contract Documents on behalf of <br />City, to accept work, and to make decisions or actions binding on City, and shall have sole <br />signature authority on behalf of City. <br />C. City may assign all or part of the Project Manager's rights, responsibilities and duties to a <br />Construction Manager, or other City Representative. <br />3.02 CONTRACTOR'S PROJECT MANAGER AND OTHER KEY PERSONNEL <br />A. Contractor has designated �5 A. KAM(e h 1 as its Project Manager to <br />act as Contractor's Representative in all matters relating to the Contract Documents. <br />B. Contractor has designated the following other Key Personnel for the Project: <br />[Name <br />R U <br />Position <br />Superintendent [See Doc. 00 7200 Para. 8.01.6] <br />Project Engineer <br />ARTICLE 4 LIQUIDATED DAMAGES FOR DELAY IN COMPLETION OF WORK <br />4.01 LIQUIDATED DAMAGE AMOUNTS <br />A. As liquidated damages for delay Contractor shall pay City One Thousand, Five Hundred <br />dollars ($1,500.00) for each Day that expires after the time specified herein for Contractor <br />to achieve Substantial Completion of the entire Work, until achieved. <br />B. As liquidated damages for delay Contractor shall pay City Five Hundred dollars ($500.00) <br />for each Day that expires after the time specified herein for Contractor to achieve Final <br />Completion of the entire Work, until achieved. <br />4.02 SCOPE OF LIQUIDATED DAMAGES <br />A. Measures of liquidated damages shall apply cumulatively. <br />B. Limitations and stipulations regarding liquidated damages are set forth in Document <br />00 7200 (General Conditions). <br />ATTY/DOCS-AGREEMENT/CONSTRUCTION AGREEMENT <br />REV: 09-09-2020 PR <br />AGREEMENT -2021-2022 WATERMAIN REPLACEMEN-f PROJECT-BROOKLINE <br />