My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Rec-Doc2022-044657 STMMA South Main Block B
RedwoodCity
>
City Clerk
>
Recorded Docs CC&Rs
>
Recorded Docs 2013-2020 Additional sub folders
>
Recorded Documents 2013-2023 (additional sub folders)
>
Maintenance Agreement
>
Rec-Doc2022-044657 STMMA South Main Block B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2022 12:43:48 PM
Creation date
8/2/2022 12:42:42 PM
Metadata
Fields
Template:
Recorded Docs
Recorded Docs - Type
Agreement
Subject
Stormwater Treatment Measures Maintenance Agreemen
Doc Num
2022-044657
Rec Date
6/1/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT C <br />1601 EI Camino Real <br />Parcel 'B' <br />Storm Water Treatment Maintenance Plan <br />Project Address & Cross Streets: <br />1601 El Camino Real. Redwood City. CA 94063 <br />Located Between Beech Street and Cedar Street <br />Assessor's Parcel No.: <br />Property Owner: IQHQ Eloo Yards, LP <br />Phone No.: (818)497-4340 <br />Designated Contact: ]an Colburn <br />Mailing Address: 674 Via De La Valle Suite 206 <br />Solana Beach CA 92075 <br />The property contains two (3) treatment devices and one (1) detention vault located as described below <br />and as shown in the attached site plan: <br />• Media Filter Vault BB -1 is located at the intersection of Beech Street and Lathrop Street. <br />• Flow -Through Planter BB -2 is located on Building B towards Lathrop Street. <br />• Media Filter Vault BB -3 is located at the intersection of Beech Street and Cedar Street. <br />• Detention Pipe is located at the intersection of Beech Street and Cedar Street.\ <br />• Flow-through Planter B-2 is located along Beech Street. <br />• Flow-through Planter B-4 is located along Beech Street. <br />• Flow-through Planter E-2 is located along EI Camino Real. <br />• Flow-through Planter L-3 is located along Lathrop Street. <br />■ Flow-through Planter L-5 is located along Lathrop Street. <br />■ Silva Cell Treatment area C-1 is located at the corner of EI Camino Real and Cedar Street. <br />Page 1 <br />ATTY/AGR.2022.074/STMMA (Page 19 of 22) <br />
The URL can be used to link to this page
Your browser does not support the video tag.