My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt21 RRM Design Group
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2021
>
Agmt21 RRM Design Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2022 3:51:42 PM
Creation date
8/31/2022 3:50:35 PM
Metadata
Fields
Template:
Agreement
Contractor Name
RRM Design Group
PROJECT NAME
Landscape architectural firm
RMP File Number
304
Date
9/30/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 08-04-2021 RL <br />ATTY/AGR.2021.207/RRM (Downtown Parks and Bay Connectivity Project) (Page 24 of 32) <br />Task <br />D.I <br />Park Design <br />Concept Designs <br />(see footnote) <br />$74,000 <br />D.2 <br />Preferred Plans <br />$65,800 <br />D.3 <br />Design Development - Lot A <br />$52,150 <br />$13,828 <br />$7,660 <br />DA <br />Preferred Plan Cost Statements <br />D.4. I <br />Design Development Cost Statement- Lot A <br />D.5 <br />Project Description - Preferred Plan and/or Design Development Plan <br />$3,540 <br />D.6 Planning Entitlement Package- Lot A $8,678 <br />Task D Value: $225,656 <br />Task E: Environmental Analysis - CEQA Document (IS/MND) <br />E.1 IS/MND - Lot A $94,903 <br />Task E Value: $94,903 <br />Task F: Final Design Construction Documents - Lot A <br />F. I Utility Coordination $2,070 <br />F.2 <br />65% PS&E <br />92,920 <br />F.2.1 <br />95% PS&E Building and Inspection Submittal <br />$57,875 <br />F.3 <br />100% PS&E <br />$38,194 <br />F.4 <br />Bidding Assistance <br />$9,187 <br />$8,460 <br />F.5 <br />Drainage Study and Stormwater Management Plan (Regulated Project) <br />F.6 <br />Stormwater Pollution Prevention Plan (SWPPP) <br />$6,160 <br />F.7 <br />Utility Calculations <br />$2,710 <br />Task F Value: $217,576 <br />•sk G: Contingency <br />G.1 I Contingency Tasks $20,000 <br />REV: 08-04-2021 RL <br />ATTY/AGR.2021.207/RRM (Downtown Parks and Bay Connectivity Project) (Page 24 of 32) <br />
The URL can be used to link to this page
Your browser does not support the video tag.