My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
RecDoc 2020-042104 CONF 49 Orchard Ave.
RedwoodCity
>
City Clerk
>
Recorded Docs CC&Rs
>
Recorded Docs 2013-2020 Additional sub folders
>
Recorded Documents 2013-2023 (additional sub folders)
>
Agreements
>
2019-2022
>
RecDoc 2020-042104 CONF 49 Orchard Ave.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2022 4:01:19 PM
Creation date
8/31/2022 4:00:34 PM
Metadata
Fields
Template:
Recorded Docs
Recorded Docs - Type
Agreement
Subject
Subdivision Agreemetn
Doc Num
2020-042104
Rec Date
5/12/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sidewalk improvements, storm drain systems, domestic water systems and sanitary <br />sewer systems for the Project (collectively, "Improvements"). <br />F. Upon approval and recordation of the Parcel Map, the Property will be <br />divided into 3 residential lots. <br />G. City and Developer desire to enter into this agreement providing for the <br />construction and installation of the Improvements in accordance with the Improvement <br />Plans. <br />AGREEMENT <br />NOW, THEREFORE, in consideration of the faithful performance of the terms and <br />conditions set forth in this Agreement, the Parties hereto agree as follows: <br />1. Purpose. The purpose of this Agreement is to guarantee completion of the <br />Improvements and ensure satisfactory performance by Developer of Developer's <br />obligations to satisfy the Conditions pertaining to the Improvements. <br />2. Property Subject to Agreement. The Property will be subject to this <br />Agreement. <br />3. Duty to Install Improvements. Developer will construct, install and <br />complete, or cause to be constructed, installed and completed, at Developer's sole cost <br />and expense, the Improvements, in accordance with the Improvement Plans and to the <br />satisfaction of the City Engineer, in their reasonable discretion. Developer will also supply <br />all labor and materials therefor, all in strict accordance with the terms and conditions of <br />this Agreement. The Improvements will include, but are not necessarily limited to, all of <br />the following: <br />REV: 01-09-20 PR <br />(a) grading, paving; <br />(b) curbs, gutters, concrete walkways, driveways, street resurfacing (slurry <br />seal), striping; <br />(c) sanitary sewer services, complete; <br />(d) water services, complete; <br />(e) storm drainage and detention systems, complete; <br />(f) underground utility joint trenching; <br />(g) <br />(h) all Conditions of the Tentative Map; and <br />(i) all other work, improvements, or construction required by or specified in <br />the abovementioned plans and specifications, conditions of permits and <br />all construction, appurtenances and improvements necessary as <br />ATTY/AGR.2020 002/49 Orchard (Page 2 of 22) <br />
The URL can be used to link to this page
Your browser does not support the video tag.