Laserfiche WebLink
REV: 08-25-2022 RL <br />both comparisons, Consultant shall use tabular and graphical techniques to clearly <br />communicate the differences. <br />Consultant shall assess revising rates to account for differences in sewer flow by <br />customer classes and the proportionality of fixed and volumetric rate revenues. <br />Deliverables: Consultant shall provide proposed five-year rates, customer bill impacts, <br />and bill comparisons integrated into the 10-year sewer model developed for Task 1b. <br />Task 1e. Communicate Results <br />All meetings and presentations described will encompass the results of the water and <br />sewer rate and development fee studies, unless indicated otherwise on the project <br />schedule. All draft deliverables shall be submitted to the Public Works Director or their <br />designee(s) to allow for a minimum two-week review period from the Public Works <br />Director or their designee(s). <br />Project Status Meetings <br />Consultant shall provide status updates to City staff to communicate progress on tasks <br />and ensure alignment with staff direction and timing. During the kick-off meeting, <br />Consultant shall establish a day and time for standing 30-minute check-in calls with staff <br />every two weeks. These meetings are intended to obtain staff input and develop solutions <br />that will be accepted by City Council and ratepayers. <br />Preliminary Findings Memorandum <br />Midway through the conduct of the project, Consultant shall document the results of the <br />analysis in a brief memorandum that summarizes: a) any adjustments to existing rate <br />designs, including customer classes; b) the cost-of-service model showing allocation of <br />costs to customer classes; c) any recommended adjustments to existing rates and rate <br />designs, including ideal schedule of years to adopt; and, d) a comparative analysis <br />illustrating Redwood City’s current and proposed rates alongside other neighboring <br />utilities. <br />Presentation to Utilities Sub-Committee <br />At least two months prior to the mailing of the Proposition 218 notice, using a City <br />template, Consultant shall prepare a PowerPoint presentation with basic, conceptual rate <br />designs and recommendations for a rate workshop with the City’s Utilities Sub- <br />Committee, for review by the Public Works Director or their designee(s). Consultant shall <br />incorporate any feedback from City staff prior to presentation of the final slides to the <br />Utilities Sub-Committee. Consultant may present the slides to the committee and either <br />via video conference and/or in-person, as determined by the Public Works Director or <br />their designee(s). <br />Consultant shall revise the presentation made to the Utilities Sub-Committee based on <br />the committee’s feedback and present final findings and recommendations during a <br />subsequent Utilities Sub-Committee meeting in Q1 of 2023 either via video conference <br />and/or in-person, as determined by the Public Works Director or their designee(s). <br />ATTY/AGR.2022.318/HF&H Consultants, LLC (Page 13 of 27)