My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt22 Bay Area Geological Group (BAGG)
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2022
>
Under $ 100K
>
Agmt22 Bay Area Geological Group (BAGG)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2023 12:10:11 PM
Creation date
9/22/2022 12:13:44 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Bay Area Geological Group (BAGG)
PROJECT NAME
Construction Inspection Services
Date
9/15/2022
MO Ref
Mo #23-092
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 08-23-2022 JB <br />CHANGE IN CONSTRUCTION INSPECTOR <br />Consultant shall assign individual persons as Construction Inspector for the duration of <br />this Agreement, as approved by the City Engineer or designee. <br />Should Consultant’s City-approved Construction Inspector have a planned absence such <br />that they will not be available to provide inspection services on any particular day or time, <br />Consultant shall provide advance notice to City and shall provide alternative means of <br />providing inspection services until City-approved Construction Inspector becomes <br />available. <br />Individual persons designated as Construction Inspector by Consultant and approved by <br />City shall not change unless City Engineer approves of such change in writing in advance <br />to the change being made, except in unforeseen circumstances such as an employee <br />illness, in which such circumstance Consultant shall notify City as soon as practical. <br />ATTY/AGR.2022.315/BAGG (Inspection) (Page 13 of 13)
The URL can be used to link to this page
Your browser does not support the video tag.