My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
RecDoc 2022-069457 3247 Oak Knoll Drive STMMA
RedwoodCity
>
City Clerk
>
Recorded Docs CC&Rs
>
Recorded Docs 2013-2020 Additional sub folders
>
Recorded Documents 2013-2023 (additional sub folders)
>
Stormwater Treatment Measure Agreements
>
RecDoc 2022-069457 3247 Oak Knoll Drive STMMA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2022 10:48:30 AM
Creation date
10/24/2022 10:47:23 AM
Metadata
Fields
Template:
Recorded Docs
Recorded Docs - Type
Agreement
Subject
Stormwater Treatment Measures Maintenance agtm.
Doc Num
2022-069457
Rec Date
9/26/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit C <br />Inspection & Maintenance Checklist <br />3247 Oak Knoll Drive <br />Stormwater Treatment Measure Operation and Maintenance <br />Inspection Report to the City of Redwood City, California <br />This report and attached Inspection and Maintenance Checklists document the inspection <br />and maintenance conducted for the identified stormwater treatment measure(s) subject to <br />the Maintenance Agreement between the City and the property owner during the annual <br />reporting period indicated below. <br />I. Property Information: <br />Property Address or APN: 3247 Oak Knoll Drive, APN: 057-211-040 <br />Property Owner: Mr. Timothy Regan, Owner <br />Contact Information: <br />Name of person to contact regarding this report: <br />Phone number of contact person: (650) 578-1237 Email: RegansRenovations@sbcglobal.net <br />Address to which correspondence regarding this report should be directed: <br />2835 Hacienda Street <br />San Mateo, CA 94403 <br />II. Reporting Period: <br />This report, with the attached completed inspection checklists, documents the inspections <br />and maintenance of the identified treatment measures during the time <br />period from <br />to <br />III. Stormwater Treatment Measure Information. <br />The following Stormwater treatment measures (identified treatment measures) are located on <br />the property identified above and are subject to the Maintenance Agreement: <br />Identifying <br />Type of Treatment Measure <br />Location of Treatment Measure on <br />Number of <br />the Property <br />Treatment <br />Measure <br />1 <br />Bioretention Areas <br />See Exhibit B <br />2 <br />Infiltration Trenches <br />See Exhibit B <br />3 <br />Flow Wells <br />See Exhibit B <br />Page 1 O&M Inspection Report <br />ATTY/AGR.2022 060/Timothy Regan (Page 12 of 23) <br />
The URL can be used to link to this page
Your browser does not support the video tag.