Laserfiche WebLink
"E" Wells Subarea 2 [approx. <br />100 ft (L) x 20 ft (W)] <br />"E" Wells Subarea 1 [approx. <br />150 ft (L) x 90 ft (W)] <br />PRB Emplacement Area <br />[approx. 22 ft (L) x 150 ft (W)] <br />"D" Wells Area [approx. <br />275 ft (L) x 150 ft (W)] <br />El Camino Real <br />Source Area <br />Scale In Feet (Approximate) <br />0 120 <br />N <br />Sequoia Station Shopping Center <br />1071 El Camino Real <br />Redwood City, California <br />Full-Scale Remediation Areas <br />3 <br />Designed <br />Approved <br />Date <br />10/17/18 <br />S.P. <br />E.V. <br />Figure <br />Drawn <br />M:\Graphics\3000-CA-North\Sequoia-Redwood City\Sequoia-Redwood City SM.dwg, B-120, evegaExhibit C - Site Locatiion & Injection Area Maps <br />ATTY/AGR.2022.348/Regenesis Bioremediation Products (Page 29 of 34)