My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
RecDoc 2022-078393 1180 Main Street
RedwoodCity
>
City Clerk
>
Recorded Docs CC&Rs
>
Recorded Docs 2013-2020 Additional sub folders
>
Recorded Documents 2013-2023 (additional sub folders)
>
Agreements
>
2019-2022
>
RecDoc 2022-078393 1180 Main Street
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2022 11:17:29 AM
Creation date
12/21/2022 11:16:44 AM
Metadata
Fields
Template:
Recorded Docs
Recorded Docs - Type
Agreement
Subject
Stormwater Treatment Measures Maintenance Agreemen
Doc Num
2022-078393
Rec Date
11/9/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REVISED EXHIBIT C <br />Bioretention Area' Maintenance Plan for <br />1180 Main Street <br />04/21/2022 <br />Bioretention areas function as soil and plant - <br />based filtration devices that remove pollutants <br />through a variety of physical, biological, and <br />chemical treatment processes. These facilities <br />normally consist of a ponding area, mulch layer, <br />vegetation and biotreatment soil mix. <br />Project Address and Cross Streets <br />1180 Main Street Redwood City, CA 94063 <br />NE of intersection of Main Street and Elm Street <br />Assessor's Parcel No.: 053-147-060, 053-147-070 <br />Property Owner: Premia 1180 Main Owner, LLC <br />Phone No.: (650) 600-7430 <br />Designated Contact: Gloria Arteaga <br />Phone No.: (650) 600-7432 <br />Mailing Address: 801 Hamilton Street <br />Redwood City, CA 94063 <br />The property contains 2 bioretention area(s), located as described <br />below and as shown in the attached site plant. <br />• Treatment Area #4 is located at the North end of Elm Street <br />• Treatment Area #5 is located at the South end of Elm Street <br />I. Routine Maintenance Activities <br />The principal maintenance objective is to prevent sediment buildup and clogging, which <br />reduces pollutant removal efficiency and may lead to bioretention area failure. Routine <br />maintenance activities, and the frequency at which they will be conducted, are shown in <br />Table 1. <br />Table 1 <br />Routine Maintenance Activities for Bioretention Areas <br />No. <br />Maintenance Task <br />Frequency of Task <br />1 <br />Remove obstructions, debris and trash from bioretention <br />Monthly, or as needed after storm <br />area and dispose of properly. <br />events <br />2 <br />Inspect bioretention area to ensure that it drains between <br />Monthly, or as needed after storm <br />storms and within five days after rainfall. If ponded water <br />events <br />does not drain within five days, check if drains are <br />clogged or consider removing the surface biotreatment <br />soil and replacing with the approved soil mix and replant <br />3 <br />Inspect inlets for channels, soil exposure or other <br />Monthly, or as needed after storm <br />evidence of erosion. Clear obstructions and remove <br />events <br />sediment. <br />4 <br />Remove and replace all dead and diseased vegetation. <br />Twice a year <br />Bioretention areas include linear treatment measures designed to filter water through biotreatment soils. A bioretention <br />area that has no waterproof liner beneath it and has a raised underdrain in the underlying rock layer to promote <br />infiltration, as shown in Section 6.1 of the C.3 Technical Guidance, may also be called a "bioinfiltration area". <br />z Attached site plan must match the site plan exhibit to Maintenance Agreement. <br />Page 1 Revised 02/11/2020 <br />Bioretention area O&M Template <br />ATTY/AGR.2022-Amend No. 1/Premia 1180 Main Owner, LLC (Page 11 of 13) <br />
The URL can be used to link to this page
Your browser does not support the video tag.