My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
RecDoc 2022-044667 CONF
RedwoodCity
>
City Clerk
>
Recorded Docs CC&Rs
>
Recorded Docs 2013-2020 Additional sub folders
>
Recorded Documents 2013-2023 (additional sub folders)
>
Agreements
>
2019-2022
>
RecDoc 2022-044667 CONF
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2022 12:17:11 PM
Creation date
12/21/2022 12:16:18 PM
Metadata
Fields
Template:
Recorded Docs
Recorded Docs - Type
Agreement
Subject
STMMA South Main Block E
Doc Num
2022-044667CONF
Rec Date
6/1/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT C <br />Parcel 'E' <br />1601 EI Camino Real <br />Storm Water Treatment Operation and Maintenance <br />Inspection Report to the City of Redwood City, California <br />This report and attached Inspection and Maintenance Checklists document the inspection and <br />maintenance conducted for the identified storm water treatment measure(s) subject to the <br />Maintenance Agreement between the City and the property owner during the annual reporting <br />period indicated below. <br />Property Information: <br />Property Address or APN: _ 1601 EI Camino Real <br />Property Owner: IQHQ Elco Yards LP <br />II. Contact Information: <br />Name of person to contact regarding this report: Ian Colburn <br />Contact Number: 818 497-4340 Email: icolburn@iclhcireit.com <br />Address to which correspondence regarding this report should be directed: <br />674 Via De La Valle Suite 206 <br />Solana Beach CA 92075 <br />III. Reporting Period: <br />This report, with the attached completed inspection checklists, documents the inspections and <br />maintenance of the identified treatment measures during the time period from: <br />to <br />IV. Storm Water Treatment Measure Information: <br />The following storm water treatment measures (identified treatment measures) are located on <br />the property identified above and are subject to the Maintenance Agreement: <br />Treatment Device <br />Type of Treatment <br />Location <br />Media Filter Vault BE -1 <br />18" Perk Filter (0) <br />NE corner of Building E (N) <br />Media Filter Vault BE -2 <br />18" Perk Filter (x2) <br />SW corner of Building E (N) <br />Media Filter Vault BE -3 <br />12" + 18" Perk Filter (x10) <br />Main Street, outside of Bldg E (S) <br />Flow -Through Planter BE -4 <br />Biotreatment <br />N/A <br />N/A <br />i <br />Between Shed and Bldg E (S) <br />Detention Pipe <br />NE corner of Building E (N) <br />Detention Pipe <br />Main Street, outside of Bldg E (S) <br />Along Chestnut Street <br />Flow -Through Planter C-4 <br />Biotreatment 1 <br />Page 1 <br />ATTY/AGR.2022.071/STMMA (Page 17 of 23) <br />0&M Inspection Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.