My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
RecDoc 2022-044650 CONF South Main Mixed-Use Project
RedwoodCity
>
City Clerk
>
Recorded Docs CC&Rs
>
Recorded Docs 2013-2020 Additional sub folders
>
Recorded Documents 2013-2023 (additional sub folders)
>
Agreements
>
2019-2022
>
RecDoc 2022-044650 CONF South Main Mixed-Use Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2022 10:01:18 AM
Creation date
12/27/2022 10:00:32 AM
Metadata
Fields
Template:
Recorded Docs
Recorded Docs - Type
Agreement
Subject
Subdivision Improvement Agreement
Doc Num
2022-044650 CONF
Rec Date
6/1/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
25.3 Developer agrees that if legal action is brought by City under this <br />section of this Agreement, Developer will pay all of the costs of suit, reasonable <br />attorney fees, and such other costs as may be determined by the court. <br />25.4 No failure on the part of City to exercise any right or remedy <br />hereunder will operate as a waiver of any other right or remedy that City may have <br />hereunder. <br />25.5 The rights and remedies of City are cumulative, and the exercise by <br />City of one or more of such rights or remedies will not preclude the exercise by it, <br />at the same or different times, of any other rights or remedies for the same default <br />or any other default. <br />26. Final Drawings. Upon completion of the Work and prior to final acceptance, <br />Developer will deliver to City a set of "as -built" drawings consistent with the Conditions. <br />These drawings will be in a form acceptable to the City Engineer, will be certified as being <br />"as -built" and will reflect the Work as actually constructed, with any and all changes <br />incorporated therein. Said drawings will be signed and sealed as accurate by the <br />engineer of record. <br />27. Monuments. All pipes and monuments shown on the Final Map which are <br />destroyed or displaced during construction operations will be replaced by Developer at <br />the time of the final inspection of the Improvements, if any. <br />28. Attorneys' Fees. Should any legal action be brought by either party <br />because of breach of this Agreement or to enforce any provision of this Agreement, the <br />prevailing party will be entitled to all costs of suit, reasonable attorneys' fees and such <br />other costs as may be determined by the court. <br />29. Notices. Any notices relating to this Agreement will be given in writing and <br />will be deemed sufficiently given and served for all purposes when delivered personally <br />or by generally recognized overnight courier service, or five (5) days after deposit in the <br />United States mail, certified or registered, return receipt requested, with postage prepaid, <br />addressed as follows: <br />To Developer: IQHQ Elco Yards, L.P. <br />674 Via De La Valle, Suite, 206 <br />Solana Beach, CA 92075 <br />Attn: Kelley Gallese <br />With a copy to- Holland & Knight LLP <br />400 South Hope Street, 8th Floor <br />Los Angeles, CA 90071 <br />Attn: Douglas Praw <br />Email: doug.praw@hklaw.com <br />REV: 04-07-2022 SK <br />ATTY/AGR.2022.083/South Main SIA (Page 15 of 26) <br />
The URL can be used to link to this page
Your browser does not support the video tag.