My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
RecDoc 2022-044664 CONF South Main Block D
RedwoodCity
>
City Clerk
>
Recorded Docs CC&Rs
>
Recorded Docs 2013-2020 Additional sub folders
>
Recorded Documents 2013-2023 (additional sub folders)
>
Agreements
>
2019-2022
>
RecDoc 2022-044664 CONF South Main Block D
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2022 10:11:58 AM
Creation date
12/27/2022 10:11:08 AM
Metadata
Fields
Template:
Recorded Docs
Recorded Docs - Type
Agreement
Subject
STMMA
Doc Num
2022-044664
Rec Date
6/1/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT C <br />Parcel 'D' <br />1601 El Camino Real <br />Storm Water Treatment Operation and Maintenance <br />Inspection Report to the City of Redwood City, California <br />This report and attached Inspection and Maintenance Checklists document the inspection and <br />maintenance conducted for the identified storm water treatment measure(s) subject to the <br />Maintenance Agreement between the City and the property owner during the annual reporting <br />period indicated below. <br />I. Property Information: <br />Property Address or APN: 1601 EI Camino Real <br />Property Owner: IQHQ TRS Elco Yards Inc. <br />II. Contact Information: <br />Name of person to contact regarding this report:_ Ian Colburn <br />Contact Number: 818 497-4340 Email: icolburn iahgreit.com <br />Address to which correspondence regarding this report should be directed: <br />674 Via De La Valle Suite 206 <br />Solana Beach. CA 92075 <br />III. Reporting Period: <br />This report, with the attached completed inspection checklists, documents the inspections and <br />maintenance of the identified treatment measures during the time period from: <br />to <br />IV. Storm Water Treatment Measure Information: <br />The following storm water treatment measures (identified treatment measures) are located on <br />the property identified above and are subject to the Maintenance Agreement: <br />Treatment Device _ Type of Treatment Location <br />Flow -Through Planter BD -1 Biotreatment Between Building D and Lathrop <br />Media Filter Vault BD -2 12" & 18" Perk Filter (x2) Along Lathrop Street <br />Flow -Through Planter BD -3 Biotreatment Between Building D and Beech <br />Detention Pipe N/A Along Lathrop Street <br />Flow -Through Planter E-3 Biotreatment Along Elm Street <br />Silva Cell Treatment M-1 Silva cell treatment <br />Silva Cell Treatment M-2 I Silva cell treatment <br />Page 1 <br />Along Main Street <br />Along Main Street <br />ATTY/AGR.2022.072/STMMA (Page 17 of 23) <br />O&M Inspection Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.