Laserfiche WebLink
PERFORATED DISTRIBUTION <br />PIPE. SEE PLUMBING PLANS <br />FOR SIZE AND MATERIAL <br />OVERFLOW PIPE-) <br />2" MIN. FREEBOARD <br />6" MIN. STORAGE <br />2-3" MULCH, SEE <br />LANDSCAPE PLANS , <br />f <br />PERFORATED 4" <br />SUBDRAIN PIPE — <br />FLOW-THROUGH PLANTER - BB -2 <br />N.T.S. <br />TREATMENT PLANTER NOTES <br />DETAILS PROVIDED FOR SIZING CRITERIA ONLY. REFER <br />TO BUILDING PERMIT DRAIWNGS FOR FINAL DETAILS ON <br />ALL ON-SITE PLANTERS. <br />18" LOAMY SAND PER SAN MATEO COUNTY C.3 <br />LJ REGULATED PROJECTS GUIDE <br />12" DRAIN ROCK LAYER WITH 4" PERFORATED <br />PIPE AT 0.5% MIN. SLOPE. <br />REFER TO LANDSCAPE PLANS FOR PLANTINGS <br />�3 IN COMPLIANCE WITH SAN MATEO C.3 <br />REGULATED PROJECTS GUIDE. <br />REFER TO BUILDING PERMIT DRAWINGS FOR <br />STRUCTURAL AND WATERPROOFING DETAILS <br />FOR ON-SITE TREATMENT PLANTERS. <br />BUILDING <br />STRUCTURE <br />s <br />DISCHARGE TO LOWER <br />- LEVEL DETENTION VAULT, <br />SEE PLUMBING PLANS <br />BC -2, BC -3, BE -4 <br />g EXHIBIT B2 <br />TALUS STORM WATER MAINTENANCE AGREEMENT <br />u� <br />led (D <br />BUILDING B, C, E DETAILS <br />o ENORIIERINO I PLANNING I DEVELOPMENT <br />r� <br />Job No.: 18190 Date: 01/19/22 Sheet: 02 of 05 <br />a <br />ATTY/AGR.2022.074/STMMA (Page 12 of 22) <br />