Laserfiche WebLink
Fremont Office <br />43650 Osgood Rd <br />Fremont CA 94539 <br />Phone: (510) 656-2840 Fax: (510) 656-2397 <br />Quotation <br />Contractors License No. 374600 <br />DIR Registration No. 1000000306 <br />A General Engineering <br />C-13 Fence, Wire, wood <br />C-32 Highway Improvement <br />Union Contractor/ No minority Status <br />COMMENTS, EXCLUSIONS, AND STIPULATIONS <br />The following stipulations are hereby incorporated into and made part of the quotation from Chrisp co. <br />dated March 12, 2020 for the following project <br />Pavement Preservation (Twin Dolphin Overlay) <br />• NO RETENTION TO BE TAKEN ON CONTRACTS LESS THAN $5,000.00 <br />• 1 Move- In(s) included. Additional Move- Ins $3,000.00 <br />• Chrisp Company reserves the right to withdraw proposal if written acceptance is not received within 30 days of bid <br />date <br />• EXCLUDE: Installation or removal of temporary delineation <br />• Clean, clear and unobstructed access required for Chrisp Co. work <br />• Final PAY QTYS presented by owner MUST be agreed by Chrisp Co. <br />• Changeable Message board If required to be provided by General Contractor for Chrisp Co. Use at no Charge to <br />Chrisp Co. <br />• EXCLUDE: Traffic Control Plan <br />• EXCLUDE: Fire Lane Striping and Signage <br />• EXCLUDE: Seal Coat <br />• EXCLUDE: Removal of Concrete Curing Material prior to PAINT I THERMOPLASTIC / PAVEMENT MARKER <br />• EXCLUDE: Red -Lined As -Built Drawings <br />• Traffic Control INCLUDED for Chrisp Company work ONLY <br />• After receiving contract 10 working days written notice required prior to scheduling of work <br />• EXCLUDE: Special Insurance Requirements,(I.e. Railroad Insura <br />• All night lights required are to be supplied by general contractor <br />• EXCLUDE: ALL Signs on Traffic Signal Plans <br />• EXCLUDE: Pedestrian Barricades <br />• EXCLUDE: Construction Area Signs <br />• Chrisp Co. will remove contractors short term temporary markers (Floppys) placed for lanelines and centerlines <br />only (no edgelines or shoulders). No Tape removal. Short Term Temporary markers are to be placed so that striping <br />may be placed before removal of temporary markers. <br />• This quotation excludes Primary Liability Insurance greater than $2,000,000. <br />• This quotation excludes all work associated with the project SWPP and WPCP. <br />• This quotation excludes installing permanent striping while other operations are in progress on jobsite. <br />• This quotation excludes performing removal work while other operations are in progress on jobsite. <br />• This quotation excludes the removal & disposal of hazardous grindings & spoils from jobsite. <br />• This quotation Excludes furnishing or placing ALL signage for advance posting of ramp closures / detours for our <br />operations. <br />• This quotation Excludes furnishing or placing ALL detour signage for our operations. <br />• EXCLUDE: Encroachment Permit (If required to be provided at No Cost to Chrisp Company) <br />Page 2 of 3 <br />