Laserfiche WebLink
Lane Closure Daily Rate on f :onventional Road(per Caltrans drawin T11 g00 /CLAY <br />a Includes a 1 man crew with a pickup truck and up to 60 cones, 6 vinyl signs with stands, and arrow board <br />a Rates inblude a shift of 8 hours ST. 'A day minimum charge. Full shift charge after 4 hours. <br />Add $50 per 8 hour shift for night work labor premium and $20 per portable flashing beacon <br />• Hourly rates, OT day $1351 OT night $142.5111 IST day $1601 DT night $170 <br />• Mobilization and subsistence charges may apply based on scope of work, location, and schedule <br />Ladle Closure Daily Rate for Freeways (tier Caltrans drawing TIM X16601 PAY <br />» Includes, a 2 man crew with a pickup truck, up to 100 cones, 8 vinyl signs with stands, and arrow board. <br />+ Rates Include a shift of g hours ST. 1/ day minimum charge. Full shift charge atter 4 hours. <br />. Add $100 per 8 hour shift for night work labor premium and $20 per portable flashing beacon, <br />• Hourly rates; OT day $2461 OT night $260 f DT day $300 1 DT night $310 <br />Add $1300 per 8 hr shift to include an operated attenuator truck ($1360 for night work), Hourly rates: OT <br />day $187.60 / OT night $1061 DT day $212.50 / !7T night $222,60. Mobilization& Idle time charges may <br />apply. <br />• Additional charges apply for closure of additional lanes. <br />• Mobilization and subsistence charges may apply based on scope of work, location, and schedule <br />Lane Closure with Rvprsibie I..ano (nee Caltrans drawlacl 131---- - - $1 M) DAY <br />w Includes a 2 man Grew with a pickup truck, up to 50 cones, 10 vinyl slgns with stands, and 2 beacons. <br />a Rates Include a shift of 8 hours ST. Y, day minimum charge, Full shift charge after 4 hours, <br />- Add $100 per 8 hour shift for night worklabor premium, $201addt'Ibesoon, ,and $2251shift/light tower. <br />• Hourly rates: QT day $245 / OT night $2601 DT day $300 / OT night $310 <br />« Add $800 per 8 hr shift to Include an operated pilot car ($850 for night work). Hourly rates; OT day $125/ <br />OT night $132.501 DT day $1501 DT night $160. Mobllixatlon & idle time charges may apply. <br />q Rumble strips are not included. Add $300/day + rnobillzation for 12ea, if required. <br />. Lunch and breaks to be covered by the client or add $e40 per 8 hr day shift for a V flagger. <br />Traffic Fla rrwnlTec:hnician Hours rite 801 HR 5T 10a 1 HES OT 1301 HR DT <br />a Rate does not include a pickup truck <br />Labor rates to be used in addition to lane closure dally rate <br />- 4 hour minimum. After 4 hrs a full 8 hr shift will be charged. <br />• Add $6 per ST HR / $7.60 per (0T HR 1$10 per DT HR for night labor premium and $2251shifi/light tower. <br />• Laborers must be given rest and lunch breaks per unlon agreements and state law. <br />• Add $10 per hr to rates for SFMTA bus de-polers (availability not guaranteed) <br />Traffic Syrseryisor (HouNv ratel _�. $1110 / HIR ST. $1261 Hfj OT. $1601 UR _QT <br />• Rate includes pickup truck <br />• Labor rates to be used in addition to lane closure daily rate <br />* 4 hour minimum. After 4 hrs a full 8 hr shift will be charged. <br />- Add $$ per ST HR / $7.50 per OT HR 1$10 per DT HR for night work labor premium <br />• Laborers must be given rest and lunch breaks per union agreements and state law <br />- Add $10 per hr to rates for SFMTA bus de-polers (availability not guaranteed) <br />L5 <br />- 24"46" 6hest, VwW scale (or 11"x17", 1"=100'scale) <br />Includes stamp by licensed civil engineer <br />« First revision is free. Additional revisions will be billed hourly. <br />Price includes an emailed submittal only ($2.00/SF for color plotting * postage) <br />• Hourly rate to attend meetings, site visits, permit assistance, multiple drawing revisions, etc. is $276 for <br />principal, $176/HR for licensed engineer and $1$0/HR hour for Junior engineer <br />+ Add $250 per sheet as a rush charge when a plan Is ne[ided with less than 1 week lead time: and we are <br />able to accorrrmodate the request, This fee will be charged at the discretion of CMC. Tho 1 week <br />minimum lead time Is not a guarantee that plans oan normally be completed in 1 week. <br />&oofideAii-ai (Rev 8.001,10)__^ -- -Page 2 of 3 3/412020 <br />EO/ZD 39dd 1,101io lNisNoo owD LLLT--504-91b bE:CT OZOZ/b0/E0 <br />